LMC 08 April 2009 Consolidations related to pressure protection on DFBs and DSLs

LMC 08 April 2009 Consolidations related to pressure protection on DFBs and DSLs. Perin, TE-CRG. Pressure relief devices to be installed on DFBs and DSLs. L. Tavian. Pressure relief for the DFBM / DFBA LCM links. Interface to Quadrupole. 1 x DN100. 1 x DN200. Busbar interconnection.

odell
Download Presentation

LMC 08 April 2009 Consolidations related to pressure protection on DFBs and DSLs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LMC 08 April 2009Consolidations related to pressure protection on DFBs and DSLs Perin, TE-CRG

  2. Pressure relief devices to be installed on DFBs and DSLs L. Tavian

  3. Pressure relief for the DFBM / DFBA LCM links Interface to Quadrupole 1 x DN100 1 x DN200 Busbar interconnection • 1 x DN 200 valve on interconnection sleeve • relief of DFBM box: 1 x DN100 valve • special cases: DFBMH & DFBMD, DFBAD, DFBAC/O

  4. Pressure relief device DFBM / DFBA LCM link 1 x DN200 Cross section of BB duct: 23 cm2 Cross section of link with spacers: approx. 80 cm2 Pipe int diameter 213 mm Link with spacer Spacers Hydraulic plug Pipe diam 54 mm Busbar interconnection Spacers MCI: 4.5 K, DP = 1.3 bar, Mass flow (MCI): 10 kg/s @ 4.5 K

  5. Pressure relief for the DFBM / DFBA LCM links: "standard" and special cases DFBMD/H link (4) "standard" DFBM link (19) DFBAC/O/D links (3+3)

  6. Practical implementation • Reuse existing flanges / springs • DN 200 : same as the ones installed on the dipoles • DN 100 : same as used on the rest of LHC (ISO K + springs) • Installation on the link • rectangular cut in the interconnecion sleeve • saddle "patch" with DN200 port welded onto the interconnection sleeve. Validated on prototype. • Helium discharge direction • for DN100 on DFBM CL module: horizontal discharge will need a deflector. Installation of elbow is impractical and would require demounting of the service chimney. • for DN200: two possibilities (see next slide): short duct with deflector Relief valve installed on link of DFBMM.5L6

  7. Pressure relief for the DFBM / DFBA LCM "standard" links Short duct + deflector Long duct DN100 valve DN100 valve Deflector for DN100 valve Deflector for DN100 valve Deflector for DN200 valve DN200 valve DN200 valve Preferred solution

  8. Pressure relief devices for a DFBA Low current module (LCM) 1 x DN200 High current module (HCM) 1 x DN100 4 x DN230 HCM - LCM Interconnection SHM-HCM Interconnection Shuffling module (SHM) Prototype valve under test

  9. Deflectors in front of the relief valves • Objective: avoid jet of cold helium below approx. 1.5m from ground With deflector 200 mm 1500 mm 75 mm 400 mm

  10. Work distribution: work on the vacuum tanks for equipment at atm. pressure

  11. Work distribution: work on deflectors and supports

  12. Estimation of durations for work on cryostats