1 / 9

Shock on PAC meeting in April 2003 for IBR-2 funding:

Shock on PAC meeting in April 2003 for IBR-2 funding: underfinancing by nearly 50% of JINR (MAE ~100%) Actually financing for 2003 by JINR ~50% (plan MAE ~-30%)

Download Presentation

Shock on PAC meeting in April 2003 for IBR-2 funding:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JINR Scientific Council Dubna, 5-6 June 2003

  2. Shock on PAC meeting in April 2003 for IBR-2 funding: underfinancing by nearly 50% of JINR (MAE ~100%) Actually financing for 2003 by JINR ~50% (plan MAE ~-30%) The PAC asks the Scientific Council again to repeat and to strengthen its recommendations for the upgrade of the IBR-2 reactor complex as absolute priority in international collaboration and obligation, to support the recent positive development to recover the shortfall in general funding and in the time schedule for the rest of the year 2003 and for the whole refurbishment period. Negotiations with MAE --- to obtain again the original budget. JINR Scientific Council Dubna, 5-6 June 2003

  3. IBR-2 reactor was running very reliable Reflector exchange underway Refrigerator facility delayed JINR Scientific Council Dubna, 5-6 June 2003

  4. JINR Scientific Council Dubna, 5-6 June 2003

  5. World class facility JINR Scientific Council Dubna, 5-6 June 2003

  6. Instrumentation The modernization of the reflectometer SPN-1 was successfully performed----REMUR -- full polarization analysis -- increased intensity (waiting for cold neutrons) JINR Scientific Council Dubna, 5-6 June 2003

  7. Fe/Cr multilayer Specular and off-specular reflection with polarized neutrons (++) (--) Detector pixels (+-) (-+) Structure + magnetic moments Detector pixels Time channels (wavelength) JINR Scientific Council Dubna, 5-6 June 2003

  8. Reflectometer REMUR JINR Scientific Council Dubna, 5-6 June 2003

  9. The PAC approved the reports on the themes: Development of the IBR-2 spectrometer complex and information- computation infrastructure (07-4-1012-96/2003) (07-5-1013-96/2003 The PAC supports the opening (continuation) of the themes: Development and creation of elements of neutron spectrometers for condensed matter investigations (A.Belushkin and V.Prikhodka) Radiation effects and modification of materials, radioanalytical and radioisotopic investigations at the FLNR accelerators (S.Dmitriev) as first priority topics for 2004-2008 JINR Scientific Council Dubna, 5-6 June 2003

More Related