Fashion ROW Arts District (Phase I) Improvements Cost Estimate

Fashion ROW Arts District (Phase I) Improvements Cost Estimate. Curbing for landscaped islands : $13,840.00 Striping/Car Stops for on-street parking: $7,517.00 4 . Sidewalk repairs along corridor: $5,800.00

odin
Download Presentation

Fashion ROW Arts District (Phase I) Improvements Cost Estimate

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fashion ROW Arts District (Phase I) Improvements Cost Estimate Curbing for landscaped islands : $13,840.00 Striping/Car Stops for on-street parking: $7,517.00 4. Sidewalk repairs along corridor: $5,800.00 5. Irrigation performed in-house: $975.30 6. Landscaping (trees, palms and shrubs): $29,336.00 7. Signage for entrance (actual cost will depend on type of sign): $30,000.00 Construction Total (Phase I): $87,468.30 Design (Phase I) and Zoning Plan: $25,837.00 Design Total (Phase I): $25,837.00

More Related