Marin Community College DistrictCIP Briefing – Citizen’s Oversight Committee September 13, 2005
Kentfield CampusTentative Project List • Modernization of Learning Resource Center – 66,000 gsf • Modernization of Harlan Center – 25,651 gsf • Modernization of Fusselman Hall – 14,717 gsf • Modernization of Science Center – 50,837 gsf • Modernization of Fine Arts Center – 79,636 gsf • Modernization of Student Center – 36,227 gsf • Modernization of Diamond Physical Ed Center – 36,392 gsf • Multi-purpose, Child Care & Support Facility – 75,000 gsf – New Construction • Liberal Arts Complex or Science Building - 75,000 gsf – New Construction • Facilities Maintenance Center 30,000 gsf – New Construction • Gateway Entrance Plaza – New Construction
Indian Valley CampusTentative Projects List • Modernization of Pomo Center - 47,494 gsf • Modernization of Administrative & Children’s Center - 19,588 gsf • Capital Renewal & Expansion of Central Plant - 2,000 gsf • Capital Renewal of Library – 14,280 gsf • Capital Renewal of Miwok Cluster – 28,410 gsf • Capital Renewal of Ohlone Cluster – 20,543 • Pedestrian Bridges
Bolinas Marine Biology Center • Modernization or New Construction – 3,333 gsf
District-WideTentative Projects List • Telecommunications • Infrastructure • Site • Parking & Roadways • Utilities (Sanitary, Storm, Electrical, Gas) • Fire Alarm Replacement • Access Controls • ADA Accessibility Improvements • Signage
District Architect • Campus Master Planning • Design & Drafting Guidelines • Interior & Exterior Finish Standards • Furniture, Fixtures & Equipment Standards
District Landscape Architect Services • Master Planning • District Standards • Design Guidelines
District Civil Engineering • Update all Surveys (Topographic & Boundary) • Locate, map, Identify, Inspect & Analyze all Utilities • Identify all Easements & Encumbrances on District Property • Create Accurate Electronic “As-Built” / Record Drawings that Record all Above Information • Develop District Standards and Design Guidelines
District Geotechnical Engineering • Collect and Synthesize all Existing Soils Testing and Analysis Information • Recommend and/or Perform Additional Soils Testing & Analysis • Perform Fault Analysis • Provide Design parameters for Building and Infrastructure Design
Mechanical and Plumbing Engineering • Chilled Water Systems • Heating Hot Water Systems • Co-Generation / Central Plant Systems • Water Distribution Systems • Building and Site Mechanical Systems • Savings by Design • Building and Site Control Systems
Electrical Engineering • Substations • Co-Generation • Electrical Distribution Systems • Lighting • Savings by Design • Control Systems • MCC
California Environmental Quality Act (CEQA) • Provides review, analysis & studies to assess the District’s development plan and its impact on the environment in accordance with the California Environmental Quality Act. • Prepares & Produces Required Documentation • Negative Declaration • Mitigated Negative Declaration • Environmental Impact Report(s)
Next Steps • Educational Master Plan – Road map to future • District Consultants • Design Guidelines • Building Standards • FF & E Standards • District Assessments and Surveys • Program Definition • Scope / Schedule / Budget
Next Steps • Board of Trustee Retreats • September 20th – Facilities Master Planning • October 11th – Program Controls • Green Summit on Sustainability – Facilities • September 30, 2005 – 9 A. M. to 3 P. M. • (Initial Sustainability Summit Held September 9th)
Next Steps • Projects in Design • Kentfield • Roof Repairs – Harlan Center and LRC • Partial Roof Replacement – Physical Education Building • Tree Trimming and Removal • Demolition of Larkspur Annex • IVC • Wildfire Mitigation • Partial Gas Main Replacement • Tree Trimming and Removal • Stream Erosion Mitigation
Other Issues • Kentfield • Title 9 Compliance (PE Complex) • IVC • Bridge Load Testing • Bolinas • Fault Study
Questions & Answers Dave Kirn Program Manager (415) 884-3192 Dave.Kirn@marin.cc.ca.us José D. Nuñez Director of Modernization (650) 358-6936 Jose.Nunez@marin.cc.ca.us