Marin Community College District CIP Briefing – Citizen’s Oversight Committee September 13, 2005

Marin Community College District CIP Briefing – Citizen’s Oversight Committee September 13, 2005. Kentfield Campus Tentative Project List. Modernization of Learning Resource Center – 66,000 gsf Modernization of Harlan Center – 25,651 gsf Modernization of Fusselman Hall – 14,717 gsf

ojal
Download Presentation

Marin Community College District CIP Briefing – Citizen’s Oversight Committee September 13, 2005

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Marin Community College DistrictCIP Briefing – Citizen’s Oversight Committee September 13, 2005

  2. Kentfield CampusTentative Project List • Modernization of Learning Resource Center – 66,000 gsf • Modernization of Harlan Center – 25,651 gsf • Modernization of Fusselman Hall – 14,717 gsf • Modernization of Science Center – 50,837 gsf • Modernization of Fine Arts Center – 79,636 gsf • Modernization of Student Center – 36,227 gsf • Modernization of Diamond Physical Ed Center – 36,392 gsf • Multi-purpose, Child Care & Support Facility – 75,000 gsf – New Construction • Liberal Arts Complex or Science Building - 75,000 gsf – New Construction • Facilities Maintenance Center 30,000 gsf – New Construction • Gateway Entrance Plaza – New Construction

  3. Indian Valley CampusTentative Projects List • Modernization of Pomo Center - 47,494 gsf • Modernization of Administrative & Children’s Center - 19,588 gsf • Capital Renewal & Expansion of Central Plant - 2,000 gsf • Capital Renewal of Library – 14,280 gsf • Capital Renewal of Miwok Cluster – 28,410 gsf • Capital Renewal of Ohlone Cluster – 20,543 • Pedestrian Bridges

  4. Bolinas Marine Biology Center • Modernization or New Construction – 3,333 gsf

  5. District-WideTentative Projects List • Telecommunications • Infrastructure • Site • Parking & Roadways • Utilities (Sanitary, Storm, Electrical, Gas) • Fire Alarm Replacement • Access Controls • ADA Accessibility Improvements • Signage

  6. District Design Team

  7. District Architect • Campus Master Planning • Design & Drafting Guidelines • Interior & Exterior Finish Standards • Furniture, Fixtures & Equipment Standards

  8. District Landscape Architect Services • Master Planning • District Standards • Design Guidelines

  9. District Civil Engineering • Update all Surveys (Topographic & Boundary) • Locate, map, Identify, Inspect & Analyze all Utilities • Identify all Easements & Encumbrances on District Property • Create Accurate Electronic “As-Built” / Record Drawings that Record all Above Information • Develop District Standards and Design Guidelines

  10. District Geotechnical Engineering • Collect and Synthesize all Existing Soils Testing and Analysis Information • Recommend and/or Perform Additional Soils Testing & Analysis • Perform Fault Analysis • Provide Design parameters for Building and Infrastructure Design

  11. Mechanical and Plumbing Engineering • Chilled Water Systems • Heating Hot Water Systems • Co-Generation / Central Plant Systems • Water Distribution Systems • Building and Site Mechanical Systems • Savings by Design • Building and Site Control Systems

  12. Electrical Engineering • Substations • Co-Generation • Electrical Distribution Systems • Lighting • Savings by Design • Control Systems • MCC

  13. California Environmental Quality Act (CEQA) • Provides review, analysis & studies to assess the District’s development plan and its impact on the environment in accordance with the California Environmental Quality Act. • Prepares & Produces Required Documentation • Negative Declaration • Mitigated Negative Declaration • Environmental Impact Report(s)

  14. Next Steps • Educational Master Plan – Road map to future • District Consultants • Design Guidelines • Building Standards • FF & E Standards • District Assessments and Surveys • Program Definition • Scope / Schedule / Budget

  15. Next Steps • Board of Trustee Retreats • September 20th – Facilities Master Planning • October 11th – Program Controls • Green Summit on Sustainability – Facilities • September 30, 2005 – 9 A. M. to 3 P. M. • (Initial Sustainability Summit Held September 9th)

  16. Next Steps • Projects in Design • Kentfield • Roof Repairs – Harlan Center and LRC • Partial Roof Replacement – Physical Education Building • Tree Trimming and Removal • Demolition of Larkspur Annex • IVC • Wildfire Mitigation • Partial Gas Main Replacement • Tree Trimming and Removal • Stream Erosion Mitigation

  17. Other Issues • Kentfield • Title 9 Compliance (PE Complex) • IVC • Bridge Load Testing • Bolinas • Fault Study

  18. Questions & Answers Dave Kirn Program Manager (415) 884-3192 Dave.Kirn@marin.cc.ca.us José D. Nuñez Director of Modernization (650) 358-6936 Jose.Nunez@marin.cc.ca.us