1 / 22

Overview of the Liquid Argon Front End electronics

Overview of the Liquid Argon Front End electronics. Esther Ferrer Ribas (SPP/DAPNIA-CEA) On behalf of the LArg/ATLAS collaboration. CALOR 2002. 28 th March 2002. Liquid Argon Calorimeters Barrel EM ~ 110208 channels End Cap EM ~ 63744 HEC ~ 5888 FCAL ~ 3584

Download Presentation

Overview of the Liquid Argon Front End electronics

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Overview of the Liquid Argon Front End electronics Esther Ferrer Ribas (SPP/DAPNIA-CEA) On behalf of the LArg/ATLAS collaboration CALOR 2002 28th March 2002

  2. Liquid Argon Calorimeters Barrel EM ~110208 channels End Cap EM ~63744 HEC~5888 FCAL ~3584 In total ~190 K channels High energy :pp collisions @ √s = 14 TeV Large luminosity :1033/ 1034 cm-2 s-1 Large dynamic range :50 MeV – 3 TeV

  3. Structure/segmentation • Three segmentations • Read out channels summedin projective trigger towers: Dh x Df = 0.1x 0.1

  4. Signal tdrift= 450 ns EM 50 ns FCAL (smaller gap)

  5. Requirements • Dynamic Range:16 bits (50 MeV – 3 TeV) • Resolution : sE/E ~ 10 % / √E 0.7 % (EM calo.)  calibration < 0.25 % whole energy range • Coherent noise< 5 % of incoherent noise • Inputs for Trigger Towers: Dh x Df= 0.1x 0.1 • Limited access high reliability • Radiation levels : 5 krad and 1012 N/cm2

  6. Radiation tests • L=10 34cm-2 s-1 significant radiation environment • Predominantely secondary particles • 10 years of operations • COTS (components of the shell) and ASICS (application specific integrated circuits) need to pass Radiation Tolerance Criteria (RTC) in order to be qualified. • Rad-tolerant tech. for main micro- electronics DMILL Standard test methods • NIEL (non ionizing energy loss) = 1.6 1012 N/cm2/10 yr (neutron irradiation) RTCNIEL = 1-3.6 1013 N/cm2 • TID (total ionizing dose)= 5 krad/10 yr (x-ray irradiation) RTCTID = 50-330 krad • SEE (single event effects)= 7.7 1011 h/cm2/10 yr (proton irradiation)

  7. Design CALIBRATION Generate 0.2 % precision pulses 116 boards @ 128 ch CONTROLLER 40 MHz clock LVL 1 accept signal Distribute info to control and configure 116 boards TOWER BUILDER Analog sommationo of 4 layers for trigger towers Transmit analog signals to LVL 1 cavern 120 boards @ 32 ch FRONT END Amplify, shape Sum cells within each depth layer Store signals waiting for LVL 1 Digitise selected pulses, Transmit on optical fibres 1524 boards @ 128 ch

  8. Front End Crate 38 BOARDS/CRATE 28 FEB 4 CALIBRATION 2 TOWER BUILDER 2 CONTROLLER 2 MONITORING Leak free water cooling system

  9. Front End Boards (FEB) Input signals Preamplifiers shapers SCA ADC Gain selection logic SCA controller SPAC Output: Optical link For all calorimeters = 1600 FEBs

  10. FEB-Preamplifiers • Amplify detector signals above noise level • 16 bit • High speed • Low impedance • Two types: • EM : warm bipolar hybrids(production of more than 50%) • Two different input impedances : 25/50 W • en = 0.4 nV/ √Hz (50 W ) • HEC: cold Ga As monolithics • (production and tests completed; yield = 84 %) • Circuits tested up to3 kGyand1014 N

  11. FEB-Shapers • Limit the bandwidth to optimise S/N and match the 40 MHz • Bipolar CR-RC2 (to remove signal tail and limit bandwidth) • Optimisation pic vs total noise:50 ns • Tri-gain shapers(1, 10, 100)split dynamic range without degrading intrinsic detector resolution) • Rad tolerant by design (bipolar, static MOS switches) • Summing stage for the LVL1 chain • Switches for ‘‘hot’’ cells • Full production completed. • Noise: high gain=850 µV • medium=390 µV • low=250 µV • Integral non-linearity: 0.5 %

  12. Switched Capacitor Array (SCA) • Samples @40Mhz the 3 gains of 4 calorimeter channels • 16 analog channels with 144 cells • 12 channels to store the signal • 4 channels store a reference level • subtraction of closest reference channelreduction of noise • Dynamic range needed > 12.5 bits • Store the 5 samples up to 100 µs • Read @5MHz for ADC conversion • Simultaneous Write and Read operations • DMILL • 50 Krad, 2 1013 Ncm-2 • Noise = 300 V • Fixed sequence noise < 0.2mV • Dynamic range =13.3 bits • Cell/cell gain variation < 0.02% • Drift < 3 mV/ms • Integral non linearity < 0.1% • Starting production

  13. Test Beam EM • 1 pre-series module and 4 series modules: 2 barrel, 2 End Cap • Final electronics tested with 6000 channels • 50 FEB, 12 calib, 1 TBB tested • Boards with all functionalities but not completely rad-hard HEC • 12 pre-series module and 24 series modules • 400cold channels

  14. Test Beam EM Free gain performance • Final density: 128 channels/FEB • Full dynamic range : (50 MeV-3 TeV) • Noise:~140 MeV(high gain) and ~240 MeV (medium gain) standard electron cluster • Coherent noise: 5-7% • Power dissipation: 0.7 W/ch • Medium gain predefined sample in time < threshold  high gain • Threshold in medium gain is respected • Dynamic range in high gain is well used Test Beam results Dirk’s presentation

  15. CALIBRATION BOARD • Generates 0.1% precision • calibration pulses • 9000 components • Sensitivity to various COTS • Injected charge effort develop op-amp • Static low-offset op-amp (~10 µV) • DAC in rad-hard technology DMILL Irradiated to 2kGy and 1014N : OK

  16. CALIBRATION BOARD Uniformity : 0.11 % Crosstalk < 0.1 %

  17. TOWER BUILDER BOARD • 32 trigger towers/board (120 boards) • Correction poles to get all signals at tpeak = 35 ns • Programmable delays to align pulses before summing • Prediction of the components implies a good knowledge of the electronic chain and detector • ±3 ns, 5 % • Noise =300 MeV; saturation • Irradiated :2 KGy and 3 10 13 N • Boards validated for production Analog summation of the different layers to form LVL1 towers Ouput cables (70m) Front End to LVL1 cavern ordered crosstalk < 0.2 %

  18. CONTROLLER BOARD Load, update, check different registers and parameters for all different front end boards (clock, LVL1, bunch crossing…) Time Trigger Control (TTC) 2 fibers for reliability Serial control link SPAC Special bus designed : SPAC bus Read and write lines doubled Speed 10 Mb/s October 02: 2 final boards

  19. Optical link Link to transfer FEB’s data to the Read Out Driver system • Radiation resistant Gigabit ethernet speed digital optical link : HP Glink chosen • Effort on low error rate system • Front end crate test autumn 02 : Glink ready • Extensive radiation studies : 3 kGy, 5 1013N SEE : 0.47 bit flip/link/hr  8 hrs dead time in 10 yrs LHC

  20. Conclusion and Perspectives • 6000 channels have been already used in test beam Full dynamic range Expected noise validity of the technical choices Calibration and specifications fulfilled • System crate test with all final radiation-hard boardsautumn 02 • Future Apr 03 : production of 1650 FEB Oct 04 : assembly complete Feb 05 : installation complete

More Related