An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. System Engineering David Curtis (RBSP System Engineer) Space Sciences Lab University of California, Berkeley EFW INST+SOC PDR

  2. System EngineeringOutline • Requirements & Verification • Design Overview, ICDs • Environments • Resource Budgets • Changes since SRMDR • Design Trades EFW INST+SOC PDR

  3. Systems EngineeringRequirements • Requirements flowed down to EFW via the Mission Requirements Document (MRD) • Includes references to the EFW Compliance Matrix, Environmental Spec, EME Spec, Contamination Control Spec, ICD, etc. • Includes Instrument Functional and Performance Requirements • An Instrument Requirements Document (RBSP_EFW_SYS_001) has been developed to flow these requirements down to the EFW subsystems • Requirements linked the MRD requirements • Requirements linked to the subsystem specifications • Subsystem specifications refer to their requirements from the IRD and how the design meets those requirements • Flight and SOC Software Requirements documents flow their requirements from the IRD down to the software modules • IRD specifies how each requirement is to be verified (Test, Analysis, etc) • EFW System Engineer has validated that the subsystem specifications describe an instrument that meets all the MRD requirements. EFW INST+SOC PDR

  4. System EngineeringIRD Sample EFW INST+SOC PDR

  5. System EngineeringVerification • Instrument Requirements Document (RBSP_EFW_SYS_001) identifies briefly how each requirement is verified • Verification, Validation, Test, and Calibration Plan (RBSP_EFW_TE_001) describes a plan for how requirements are verified • Discussed in I&T section • Requirements are verified as early as possible at a low level • Verifies subsystems, Retires risk • Requirements are verified at the highest level of assembly possible • Often involves verifying a requirement at several levels • System Engineer tracks Verification against IRD • Reports on status at PER, PSR EFW INST+SOC PDR

  6. System EngineeringKey Performance Requirements EFW INST+SOC PDR

  7. System EngineeringKey Subsystem Requirements EFW INST+SOC PDR

  8. System EngineeringBlock Diagram EFW INST+SOC PDR

  9. System EngineeringSubsystem Mechanical IDPU AXB (1 of 2), Stowed SPB (1 of 4), Stowed EFW INST+SOC PDR

  10. System EngineeringBooms Deployed Axial Boom Deployment Unit (1 of 2) Four 40-50m Spin Plane Booms (SPB) Two 6m Axial Booms (AXB) Spin Plane Boom Deployment Unit (1 of 4) (IDPU Mounted Inside Bus) EFW INST+SOC PDR

  11. System EngineeringICDs • Spacecraft to EFW ICD in preliminary stage (7417-9083) • Several iterations have closed out most issues • Sufficiently firm to support EFW design to start ETU build • EFW to EMFISIS ICD in preliminary stage (7417-9089) • Reached agreement on significant issues, working details • Sufficiently firm to support EFW design to start ETU build • MOC/SOC ICD in preliminary stage (7417-9050) • Several iterations have closed out most issues • EFW Subsystem specifications define interfaces between subsystems • IDPU Backplane specification – RBSP_EFW_BPL_001G • IDPU LVPS specification – RBSP_EFW_LVPS_001E • Axial Boom specification – RBSP_EFW_AXB_001- • Spin Plane Boom specification – RBSP_EFW_SPB_001- • Interconnect Drawings • RBSP_EFW_SYS_008C (harnessing) • RBSP_EFW_SYS_200A (pinouts) • RBSP_EFW_AXB_002G (AXB wiring schematic) • RBSP_EFW_SPB_002D (SPB wiring schematic) • RBSP_EFW_SYS_006 (Grounding) • RBSP_EFW_SYS_007A (IDPU Grounding) EFW INST+SOC PDR

  12. System EngineeringFlight Software • Flight Software Development Plan documented in RBSP_EFW_FSW_001 • Flight Software Requirements documented in RBSP_EFW_FSW_002 • Major Requirements Include: • Spacecraft Interface Handling • Command Reception & Distribution • Real-Time Data Collection and Playback • On-Board Evaluation for Burst Triggering • Burst Data Collection and Playback • Boom Deployment Control • Details of flight software requirements and design discussed later EFW INST+SOC PDR

  13. System EngineeringSOC Software • SOC Software Development Plan documented in RBSP_EFW_SW_001 • SOC Software Requirements documented in RBSP_EFW_SYS_010 • Major Requirements Include: • Command and Telemetry GSE (CTG): • Real time telemetry ingestion from MOC • Real time telemetry display, trending, and limit monitoring • Automated operator call-up on limit violation • Command Encoding and forwarding to MOC • Science Data Center (SDC): • Near-real time science displays • Off-line processing including Level 0 to Level 1,2 processing • Burst selection • Science Data Analysis • Details of SOC software requirements and design discussed in GSE and SOC sections EFW INST+SOC PDR

  14. System EngineeringEnvironmental • EFW to survive all environments to be encountered during ground operations, launch, and on orbit • EFW to operate in spec over all environments to be encountered during ground functional tests, on-orbit commissioning and science phases • Science Performance not achieved until booms deployed (during commissioning) • RBSP Environmental Requirements called out in 7417-9019 • RBSP EME Requirements called out in 7417-9018 • EFW Verification Plan described in RBSP_EFW_TE_001 • Describes how EFW will verify compliance with requirements, including environmental requirements • Plan discussed in more detail in I&T section EFW INST+SOC PDR

  15. System EngineeringEnvironmental Test Matrix EFW INST+SOC PDR

  16. System EngineeringMechanical • Instrument designed to Environmental Specification Requirements: • Limit Loads, Stiffness, Venting, Shock • Mechanical Interfaces, Mass NTE called out in the ICD (7417-9083) • Instrument tested per Environmental Spec: • Mass Properties at component level • Mass, CG • MOI by analysis • Sine, Random vibration at component level • ETU to qualification levels • FM to acceptance levels • No acoustic test planned (no acoustically sensitive parts) • Mechanical Design and Analyses called out in Mechanical section EFW INST+SOC PDR

  17. System EngineeringThermal REVISED • EFW interface temperature limits called out in the MRD and ICD • Operational: -25ºC to +55ºC • Survival: -30ºC to +60ºC • EFW components conductively coupled to spacecraft deck • EFW Thermal design verified by analysis and Thermal Vacuum testing • Analysis to include launch transients (heating) • Modeling and Analysis performed cooperatively between EFW and APL • Verification testing (Thermal Vac) described in I&T section • Thermal design and analysis described in the Thermal Design presentation. EFW INST+SOC PDR

  18. System EngineeringEME (1) • Instrument conforms to Design Guidelines and Requirements in 7471-9019: • Magnetics • Identified magnetic materials and circuits are provided to Magnetics Working Group, which shall maintain a watch list and participate in analysis and suggestions for mitigations as required • Deployment motors contain permanent magnets, and shall be shielded • THEMIS test results indicate shielding is effective • Magnetics will be verified by magnetics screening at the component level (ETU and Flight) • ESC • Exterior surfaces are conductive and connected to chassis ground • Boom exterior connected via a resistor • ESC Verification at the component level • surface resistance measurements • Radiation • IDPU and preamp shielding to mitigate radiation environment • Parts selected for radiation tolerance as demonstrated by TID, SEE tests, verified by APL PCB EFW INST+SOC PDR

  19. System EngineeringEME (2) • DDD • IDPU shielding to 350 mils, including connectors • Preamps have survived DDD testing • Spacecraft data interface uses APL-demonstrated DDD-insensitive parts • EFW boom unit interface DDD immunity by analysis (mostly capacitive protection) • EMFISIS interface DDD immunity by analysis and/or test (pending) • EMC: • IDPU box design includes EMC closeout (stair-step joints, vent shielding, connector close-out) • Harness has complete over-shield braid terminated on connector backshells • Supply frequency is above 400kHz, synchronized. • Supply has front end filtering, soft start • Verification by EMC tests: • ETU (CE) • FM1 (CE, CS, RE, RS, BI, On/Off transients) • FM2 (CE, BI) • Will partially deploy SPB to support Observatory EMC self-compatibility test EFW INST+SOC PDR

  20. System EngineeringGrounding Diagram EFW INST+SOC PDR

  21. System EngineeringMass Budget EFW INST+SOC PDR

  22. System EngineeringPower Budget • 3 Power Services: • Operating Power (8.93W CBE, 0.92A Peak) • Spin Plane Boom Deployment Power (4A peak power, worst case) • Axial Boom Power (4A peak power worst case) EFW INST+SOC PDR

  23. System EngineeringTelemetry Budget EFW INST+SOC PDR

  24. System EngineeringCommanding • Real Time Instrument Command Requirements: • Configuring instrument at power-on (~50 commands) • Boom Deployment (up to 10 commands/minute during deployment) • Adjusting instrument periodically (~20 commands/month) • Burst Request (up to ~20 commands/day) • Rare Memory Load (<64kbytes) • Time-Tagged Command Requirements • Mode adjustments at different parts of the orbit (~20 commands/orbit) • Most commands are small (~10 bytes with header) • Except Memory Load commands EFW INST+SOC PDR

  25. System EngineeringTechnical Changes since SRMDR EFW INST+SOC PDR

  26. System EngineeringDesign Trades (1) Design Trades completed during Phase B EFW INST+SOC PDR

  27. System EngineeringDesign Trades (2) Design Trades to be completed If not complete by MPDR, there will be additional cost/schedule impacts EFW INST+SOC PDR