1 / 10

Subir Das sdas at appcomsci dot com

Joint Opening Plenary IEEE 802.21 Media Independent Handover Services Session #51, July 2012 San Diego, CA. Subir Das sdas at appcomsci dot com. Subir Das, Chair 802.21 WG. WG Officers. The WG has 26 voting members as of this meeting. Subir Das, Chair 802.21 WG.

olga-marsh
Download Presentation

Subir Das sdas at appcomsci dot com

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Joint Opening PlenaryIEEE 802.21 Media Independent Handover ServicesSession #51, July 2012San Diego, CA Subir Das sdas at appcomsci dot com Subir Das, Chair 802.21 WG

  2. WG Officers • The WG has 26 voting members as of this meeting Subir Das, Chair 802.21 WG

  3. IEEE 802.21Meeting Server Details http://mentor.ieee.org/802.21/documents Slide 3 Subir Das, Chair 802.21 WG

  4. Session Time and Location Default Location: Edward C Subir Das, Chair 802.21 WG

  5. 802.21 WG Objective • IEEE 802.21 is developing standards to enable handover services and interoperability between heterogeneous networks including both 802 and non-802 networks Subir Das, Chair 802.21 WG

  6. Work Status • Task Group Status • 802.21c Single Radio Handovers • Proposals updated; Draft specification is underway • 802.21d Multicast Group Management • Use cases and Requirements are under discussion Subir Das, Chair 802.21 WG

  7. Objectives for the July Meeting • Task Group Activities • 802.21c: Single Radio Handovers • Finalize Draft document • 802.21d • Finalize Use cases and requirements document • Call for proposal discussion • PAR discussion • Future Project Planning Discussion Subir Das, Chair 802.21 WG

  8. Future Sessions – 2012 • Interim: 16-21 September, 2012, Hyatt Grand Champions, Indian Wells, CA, USA • Co-located with 802 wireless groups • Plenary: 11-16 Nov 2012, Grand Hyatt, San Antonio, TX • Co-located with all 802 groups Subir Das, Chair 802.21 WG

  9. Future Sessions – 2013 • Interim: 13-18 January, 2013, Hyatt Regency, Vancouver, BC, Canada • Plenary: 17-21 March, 2013, Caribe Royale, Orlando, FL, USA • Co-located with all 802 groups • Interim: 12-17 May 2013, Hilton Waikoloa Village, 2013 • Co-located with all 802 wireless groups • Plenary: 14-19, July 2013, Geneva, Switzerland • Co-located with all 802 groups • Interim: 15-20, September 2013, Nanjing , China • Co-located with all 802 wireless groups • Plenary: 10-15 Nov 2013, Hyatt Regency Reunion, Dallas, TX, USA • Co-located with all 802 groups Subir Das, Chair 802.21 WG

  10. Future Sessions – 2014 • Interim: 19-24 January, 2014, Century Plaza, Los Angeles, CA, USA • Co-located with all 802 groups • Plenary: 16-21 March, 2014, Hyatt Regency, Atlanta, GA, USA • Co-located with all 802 groups • Interim: 11-16 May 2014, Hilton Waikoloa Village, HI • Co-located with all wireless groups • Plenary: 13-18, July 2014, Manchester Grand Hyatt, San Diego, CA, USA • Co-located with all 802 groups • Interim: 14-19, September 2014, TBD • Co-located with all 802 wireless groups • Plenary: 2-7 Nov 2014, Grand Hyatt, San Antonio, TX, USA • Co-located with all 802 groups Subir Das, Chair 802.21 WG

More Related