DETECTOR COOLING PROJECT WP2 CO2 activities status report. https://espace.cern.ch/CO2/default.aspx. Jan Godlewski PH-DT-PO. Cooling plant for tests. Actual status Next steps Missing parts Tests program. Status. Test stand at cryolab Pressure test (120 bar) done

oliana
Download Presentation

DETECTOR COOLING PROJECT WP2 CO2 activities status report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DETECTOR COOLING PROJECTWP2 CO2 activities status report https://espace.cern.ch/CO2/default.aspx Jan Godlewski PH-DT-PO Jan Godlewski PH-DT-PO

  2. Cooling plant for tests • Actual status • Next steps • Missing parts • Tests program Jan Godlewski PH-DT-PO

  3. Status • Test stand at cryolab • Pressure test (120 bar) done • Chiller connected and tested • Sensors installed and connected to control rack • DAQ checked and debugged • Possibility of remote log-in to follow test stand function • ALICE Silicon Pixel Detector interested in CO2 activities • Claudio Bortolin and Rosario Turrisi have joined CO2 group Jan Godlewski PH-DT-PO

  4. Minutes from the last meeting Jan Godlewski PH-DT-PO

  5. P&I Jan Godlewski PH-DT-PO

  6. CO2 progress and issues on the control system From Łukasz CO2 PLC PVSS UNICOS project creation status: 1 – Excel specification preparation √2 – PLC hardware configuration √3 – PLC & PVSS instance generation √4 – Process logic program preparation √ 5 – Specific functions preparation√ 6 – Code compilation √7 – Loading to PLC √ 8 – PVSS Data Server configuration √ 9 – PVSS panels creation √10 – Commissioning & operation – began – all sensors values are archived Specification SCADA server InstanceGenerator SIEMENS PLC Logic Generator Jan Godlewski PH-DT-PO

  7. CO2 progress and issues on the control system Signal-electrical installation: 1 – Control rack completed √ 2 – Plant frame equipped with cable trays √ 2 – Signals cables in place and 90% connected √3 – Power cables in place and connected √4 – All sensors ,actuators and cables labeled √ 5– All PT100 connected with additional connector to ensure in case of failure fast sensor replacement √ From Łukasz Jan Godlewski PH-DT-PO

  8. Missing parts and things to do • Missing parts • Accumulator from NIKHEF • Hans Postema in contact with NIKHEF • We are requesting it for mid of June • Expansion valve for accumulator cooling • Should come these days • Some sensors • Valves extensions for cold running • Still to do • Installing and connecting accumulator • Installing valves extension • Insulation • Final commissioning of control system Jan Godlewski PH-DT-PO

  9. Summary • CO2 test stand • Test stand ready for “warm” operation • We are waiting for accumulator from NIKHEF • First thing to test will be ATLAS Pixel stave (first half of June) Jan Godlewski PH-DT-PO