210 likes | 339 Views
Development of RPCs for INO. B.Satyanarayana TIFR, Mumbai, INDIA bsn@tifr.res.in. Principle of operation. RPC test setup. Telescope. Cosmic muon trigger and timing. NIM and CAMAC electronics. Telescope rate monitoring. Gas mixing unit. Typical efficiency plot. Studies with gas mixtures.
E N D
Development of RPCs for INO B.Satyanarayana TIFR, Mumbai, INDIA bsn@tifr.res.in The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003
Principle of operation The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003
RPC test setup Telescope The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003
Cosmic muon trigger and timing The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003
NIM and CAMAC electronics The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003
Telescope rate monitoring The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003
Gas mixing unit The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003
Typical efficiency plot The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003
Studies with gas mixtures The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003
Typical timing distribution plot The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003
Typical time response plot The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003
Typical time resolution plot The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003
Typical charge distribution plots The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003
Typical mean charge plot The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003
Typical noise rate plot The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003
Typical cross-talk plots The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003
Summary of cross-talk measurements The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003
Effects of wet gases The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003
Recovering a damaged RPC • Purging with pure Argon at high flow rate. • Bubbling pure Argon through pure ethyl alcohol. • Bubbling pure Argon through 25% Ammonia solution for 24 hours without electric field. • Recovers efficiency and brings down noise rate. • Detailed studies underway. The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003
RPC recovery plots No of hours of gas flow The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003
Future plans • Study of effect of wet gases on RPC performance, aging etc. • Study of pickup strip materials, geometries & pulse characteristics • Long term studies with small chambers. • Improvements in the gas mixing unit, Cosmic test setup, etc. • Procurement of dry gases. • Production of 120cm X 90cm RPCs for prototype detector The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003