1 / 21

Development of RPCs for INO

Development of RPCs for INO. B.Satyanarayana TIFR, Mumbai, INDIA bsn@tifr.res.in. Principle of operation. RPC test setup. Telescope. Cosmic muon trigger and timing. NIM and CAMAC electronics. Telescope rate monitoring. Gas mixing unit. Typical efficiency plot. Studies with gas mixtures.

oliana
Download Presentation

Development of RPCs for INO

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Development of RPCs for INO B.Satyanarayana TIFR, Mumbai, INDIA bsn@tifr.res.in The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003

  2. Principle of operation The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003

  3. RPC test setup Telescope The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003

  4. Cosmic muon trigger and timing The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003

  5. NIM and CAMAC electronics The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003

  6. Telescope rate monitoring The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003

  7. Gas mixing unit The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003

  8. Typical efficiency plot The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003

  9. Studies with gas mixtures The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003

  10. Typical timing distribution plot The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003

  11. Typical time response plot The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003

  12. Typical time resolution plot The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003

  13. Typical charge distribution plots The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003

  14. Typical mean charge plot The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003

  15. Typical noise rate plot The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003

  16. Typical cross-talk plots The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003

  17. Summary of cross-talk measurements The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003

  18. Effects of wet gases The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003

  19. Recovering a damaged RPC • Purging with pure Argon at high flow rate. • Bubbling pure Argon through pure ethyl alcohol. • Bubbling pure Argon through 25% Ammonia solution for 24 hours without electric field. • Recovers efficiency and brings down noise rate. • Detailed studies underway. The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003

  20. RPC recovery plots No of hours of gas flow The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003

  21. Future plans • Study of effect of wet gases on RPC performance, aging etc. • Study of pickup strip materials, geometries & pulse characteristics • Long term studies with small chambers. • Improvements in the gas mixing unit, Cosmic test setup, etc. • Procurement of dry gases. • Production of 120cm X 90cm RPCs for prototype detector The 6th ACFA Workshop on Physics and Detector at Linear Collider, TIFR, Mumbai, December 15-17, 2003

More Related