Wind Energy Development in Greece. HELLENIC WIND ENERGY ASSOCIATION. HWEA Wind Energy Statistics May 2012. The HWEA Wind Energy Statistics take into account the wind capacity which is in commercial or test operation in Greece and it is based on sources from the market actors.

olisa
Download Presentation

Wind Energy Development in Greece

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wind Energy Development in Greece HELLENIC WIND ENERGY ASSOCIATION

  2. HWEA Wind Energy Statistics May 2012 The HWEA Wind Energy Statistics take into account the wind capacity which is in commercial or test operation in Greece and it is based on sources from the market actors.

  3. HWEA Wind Energy Statistics May 2012

  4. HWEA Wind Energy Statistics May 2012

  5. HWEA Wind Energy Statistics May 2012 5 months

  6. HWEA Wind Energy Statistics May 2012 Total new capacity installed in 2010: 166,75 MW Total new capacity installed in 2011 : 320,40 MW

  7. HWEA Wind Energy Statistics May 2012

  8. RES National Action Plan 2010 - 2020

  9. RES National Action Plan

  10. Investments needed 2010 - 2020

  11. Investments needed 2010 - 2020 A huge (5+ billion euros) plan for grid reinforcement and islands interconnections

  12. Licensing process before and after law 3851/2010 • The main milestones: • Production License by RAE • Environmental Impact Approval • Interconnection Terms by the Operator • Installation License • Interconnection Agreement • Power Purchase Agreement • Operation License

  13. RES Feed In Tariffs • Annual adjustment with the 50% of the inflation of the previous year • 3% of the turnover for the local societies • 10% of the turnover for the Market Operator

  14. RES Development within the last years

  15. RES Development within the last years

  16. RES in Greece 30.06.2012 Target 2020 Target 2020 Target 2014 Target 2014 Target 2020 Target 2014

  17. RES Projections 2010 - 2020 Wind Energy PV

  18. Visit us on www.eletaen.gr HELLENIC WIND ENERGY ASSOCIATION