290 likes | 550 Views
“Nucor Road Industrial Corridor – Sanitary Sewer Project”. Presented by: Justin Longstreth, P.E. Brian Hannon, P,E, Moore & Bruggink, Inc. October 14 th , 2010. Design Team Introduction. ________________________. Brian Hannon, P.E. Moore & Bruggink, Inc.
E N D
“Nucor Road Industrial Corridor – Sanitary Sewer Project” Presented by: Justin Longstreth, P.E. Brian Hannon, P,E, Moore & Bruggink, Inc. October 14th, 2010
Design Team Introduction ________________________ Brian Hannon, P.E. Moore & Bruggink, Inc. Justin Longstreth, P.E. Moore & Bruggink, Inc. Matt Healy, P.L.S., E.I.T VS Engineering, Inc. Doug Baldessari, CPA H.J. Umbaugh & Associates
Presentation Outline ________________________ Project Necessity Project Area Overview Sewer Collection & Treatment System Components Sustainable Design & Minimizing Environmental Impacts What does it cost? How do we pay for it?
____________ Project Area Overview
Septic Tanks, Drainfields and Wells ________________________ Well Septic Tank Drainfield Groundwater Level
Sanitary Sewer Forcemain (Pressurized) Pump to Treatment Plant Sanitary Sewer Forcemain (Pressurized) Sanitary Sewer (Gravity) Sanitary Sewer (Gravity) Sewage Lift Station Sewage Lift Station Typical Sanitary Sewer Collection System ________________________
Project Necessity ________________________ Soil Conditions Existing Septic Systems Failing Potential Future Growth
__________ Project Necessity
Alternative Design Considerations ________________________ • Option 1: Do Nothing • Option 2: Build Large, Centralized Wastewater Treatment Facility • Option 3: Pump Sewage To Crawfordsville Wastewater Treatment Facility • Option 4: Two Smaller Collection Systems And Treatment Facilities
____________ Project Phasing
____________ Phase I Sanitary Sewer System
___________ Chigger Hollow Sanitary Sewer
___________ Chigger Hollow Sanitary Sewer
Phase I Sanitary Sewer System ________________________ • 30,000 Feet of Gravity Sewer • 3,000 Feet of Pressurized Forcemain • 1 Lift Station • 1 Sequencing Batch Reactor Waste • Water Treatment Plant
Phase II Sanitary Sewer System ________________________
Phase II Sanitary Sewer System ________________________ • 13,000 Feet of Gravity Sewer • 9,000 Feet of Pressurized • Forcemain • 2 Lift Stations • 1 Sequencing Batch Reactor • Waste Water Treatment Plants
SBR Wastewater Treatment System ________________________ Sequencing Batch Reactor 100,000 GPD Aerobic Digester Laboratory Tertiary Filtration City of Grant SBR WWTP
Implementation of Sustainable Design ________________________ Tertiary Filtration and Reuse at Nucor Maximize use of gravity in collection system Variable Frequency Drives on Premium Efficiency Motors Use of Stabilized Sludge as Fertilizer
Minimization of Environmental Impacts ________________________ Reuse of Water Energy Efficiency Will improve water quality No destruction of habitat No structures in wetlands Quiet Enclosures on Generators
Estimated Project Costs - Phase I ________________________ Phase I Collection/Transport System Cost: $2,300,000 Phase I Sanitary Treatment System Cost: $2,309,000 Phase I Design & Construction Engineering Cost: $ 855,000 Phase I Contingency Cost: $ 455,000 Phase I Total Cost: $5,920,000 Phase I Land Acquisition Cost TBD
Estimated Project Costs – Phase II ________________________ Phase II Collection/Transport System Cost: $2,776,000 Phase II Sanitary Treatment System Cost: $2,100,000 Phase II Design & Construction Engineering Cost: $ 908,000 Phase II Contingency Cost: $ 481,000 Phase II Total Cost: $6,265,000 Phase II Land Acquisition Cost: TBD
Montgomery County Regional Sewer DistrictProposed Construction Project and Financing- October 14, 2010 -
Proposed Phase I Project and Financing • Proposed project financing through the Indiana State Revolving Fund Loan Program (“SRF”) • Phase I – $6,365,000 SRF subsidized interest rate bonds • Interest rate assumed at 3% (current rate 2%) • SRF interest rates adjust quarterly • 20-year bond issue with amortization structured to match the estimated Tax Increment Financing (“TIF”) available revenues • Anticipated bond closing in early 2011, subject to availability of funding 23
Proposed Phase I Project Project and Financing (Cont’d) • $100,000 Grant • Cash on Hand of $100,000 for use in Land & Rights of Way Acquisition which cannot be financed through SRF 24
Proposed Phase II Project and Financing • Proposed project also assumed to be financed through SRF • Financing – $6,560,000 SRF subsidized interest rate bonds • Interest rate assumed at 3.50% • 20-year bond issue with amortization structured to match the estimated Tax Increment Financing (“TIF”) available revenues • Anticipated bond closing in mid-2011, subject to availability of funding 25
Proposed Phase II Project and Financing (Cont’d) Cash on Hand of $80,000 for use in Land & Rights of Way Acquisition which cannot be financed through SRF 26
Estimated Monthly Sewer Bills for Assumed EDUs Note: Interim sewer rates during construction or non-SRF available funds may be required to pay for interest during construction. 28