AT&T Mobility Network Optimization

AT&T Mobility Network Optimization. Michael Van Weelden Director – SCM – AT&T Mobility July 14, 2007. AT&T Mobility Network Optimization Architecture Example. Cell Site. DS1/DS3 Channel Termination. Mobility Switch. OC/DS3 Channel Termination . M13. LEC/CLEC LSO. LEC MTSO SWC.

omer
Download Presentation

AT&T Mobility Network Optimization

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AT&T Mobility Network Optimization Michael Van Weelden Director – SCM – AT&T Mobility July 14, 2007

  2. AT&T Mobility Network OptimizationArchitecture Example Cell Site DS1/DS3 Channel Termination Mobility Switch OC/DS3 Channel Termination M13 LEC/CLEC LSO LEC MTSO SWC AT&T Mobility Leased/Owned Ring Service Mobility Switch DS1/DS3 Channel Termination LEC MTSO SWC M13 OC/DS3 Channel Termination LEC/CLEC LSO OC/DS3 Channel Mileage Cell Site

  3. Planning • LATA data scrubbing • LATA analysis • Align Mobility leased assets w/ ATT • Develop proposed Architecture • Network Eng’g • Joint planning Mobility Network OptimizationProcess Flow – Planning, Capacity Analysis,Implementation, and Tracking • NP&E • Capacity availability • Augment capital estimate • Network Eng’g • Finalize design • Finalize schedule • Coordinate service • Data for optimization analysis PLANNING Preliminary opportunity Capacity analysis and capital cost • Program Mgmt • Review target plan • Work w/ NP&E on capacity requirements • Term Liability impacts Bill Tamer and Granite inventory information Deliver price Manage data sources • Program Mgmt • Develop financial impact • Manage Mobility relationship CAPACITY ANALYSIS Preliminary plan and capital estimate used for pricing • Access Suppliers • Data for optimization analysis A • Tracking • Track new service Billing data disconnect tracking data New service tracking data • Provisioning • Provision new PL service IMPLEMENTATION Issue PL Order Coordinate w/ Network Engineering • Provisioning • Place new Local PL service orders • Issue disconnects • Program management of vendor and Mobility resources • Access Suppliers • Place orders for new service • Issue Disconnect Facility assignment information A

  4. AT&T Mobility Network Optimization • Network Optimization Objectives • Reduce Mobility Transport Expense • Secure high quality, reliable transport services • Promote redundancy/survivability in “core” network • Maximize circuit utilization • Optimize internal and external resources • Anticipate future capacity requirements