180 likes | 390 Views
Company Presentation. Location : Echternach, Grand Duchy of Luxembourg. Company. 3P-SOLUTIONS was founded in May 2004 and offers competent services in: Evaluation Engineering Optimization. Company. We work worldwide with: Qualified and motivated staff Efficient organisation
E N D
Company 3P-SOLUTIONS was founded in May 2004 and offers competent services in: • Evaluation • Engineering • Optimization
Company We work worldwide with: • Qualified and motivated staff • Efficient organisation • Self-developed software tools • Co-operation with selected companies 3P doesn‘t set boundaries, it creates opportunities!
Personnel of 3P-Solutions 3P-Solutions personnel are seven experienced engineers and three young engineers and system technicians. We have engineers with more than 30years of experience in the field of: - turbines - boiler control - process industry - control system design and network architecture 3P-Solutions has also contact to external personnel specialized in all fields of power plant technology
Engineering Configuration and migration of control systems, planning, acquisition, integration, installation, commissioning and maintenance. • ABB SYMPHONY and INDUSTRIAL IT • Siemens T3000 and TXP • H&B Contronic 3/I and Contronic E/EK • Programmable logic controllers (e. g.: Siemens-Simatic S 5 and S 7, PCS7, DeltaV, Elop II) • Program communication tools, Scada systems (supervisory control and data acquisition)
Networks Evaluation Optimization • Planning • Deliverance • Installation • Commissioning • Maintenance • Feasibility study • Load tests • Recommendation • of optimal automation concepts • Performance tests • Reduction of wear of the boiler components (thick walled headers and pipes) • Reduction of fuel costs • Improved operating behaviour • Reduction of emission • Online Coal-Flow & Air-Flow Measurement
Services After Sales Services • System check-ups • Troubleshooting • Spare part requests and orders On-Call Services (Tech support) • Hotline support • Remote diagnostics
Customers • ABB/UTD • ABB/APR • Westinghouse • SIC, China • BASF • ESB, Ireland • Babcock-Hitachi • Babcock Borsig • Vereinigte-Saar-Elektrizitäts-AG • Promecon Messtechnik • IMEA, Greece • PPC, Greece • Kochtransporttechnik • Eon Westfalen • EonEngineering • RWE Power • STEAG • PPC, Greece • Holfeld, Ireland • LurgiLentjes • Hora Regelamaturen • Mochenwangenpaperfactory
References • Yunfu Power Station, China 4 x 125 MW Upgrate and Update Maestro UX, Operation System 2004 • Shajiao A4 Power Station, China 1 x 300 MW Delivery, Installation and System Start up Melody / Maestro UX, Operation System 2004/05
References • Keratsini Power Station, Greece 1 x 160 MW Systemcheck and maintenance 2005 • Shajiao A3 Power Station, China 1 x 200 MW Delivery, Installation and System Start up Upgrate / Maestro UX, Operation System 2005/06
References • Moneypoint Power Station, Ireland 3 x 300 MW Consulting/Comissioning Retrofit Project 2004 – 2008 • Mochenwangen Papier GmbH Comissioning 2009 • For further references and finished projects please visit our homepage at: www.3p-solutions.lu
References • Futher references: - KW Kirchlengern, Germany - KW Buggenum, Netherlands - HKW Minden, Germany - KW Poolbeg, Ireland - KW Weiher, Germany - KW Aghada, Ireland - KW Datteln, Germany - KW Delimara, Malta - BASF Q607, Germany - HKW Frankfurt Höchst, GER - KW Lough Ree, Ireland - KW Northwall, Ireland - KW West Offaly, Ireland - ABB Vienna, Austria
Certificates Recent reference letter from ESB Ireland concerning our work in Moneypoint Power Station from 2004 – 2009, where we worked in peak times with a team of six engineers.
Contact Company 3P-Solutions S.A.Zone IndustrielleL-6468 Echternach Luxembourg Phone: +352 / 26 36 26 75Fax: +352 / 26 36 26 74E-Mail:info@3p-solutions.lu Web:www.3p-solutions.lu Commercial Registry No: B 100858