110 likes | 387 Views
The TEAP and TOC 2010 Assessment Reports Timelines and issues that will be dealt with TEAP and its TOCs Technology and Economic Assessment Panel CTOC: Chemicals TOC FTOC: Foams TOC HTOC: Halons TOC MTOC: Medical TOC MBTOC: Methyl bromide TOC
E N D
The TEAP and TOC 2010 Assessment Reports Timelines and issues that will be dealt with T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a
TEAP and its TOCs • Technology and Economic Assessment Panel • CTOC: Chemicals TOC • FTOC: Foams TOC • HTOC: Halons TOC • MTOC: Medical TOC • MBTOC: Methyl bromide TOC • RTOC: Refrigeration, AC and Heat Pumps TOC T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a
2010 TEAP and TOC Assessment Reports • Timeline of Work: (2008)-2009: • Definition of scope and content of the reports • Designation of chapter lead authors for specific chapters and sections, as well as the entire authorship • Initial determination of reports structure and layout (TOC meeting) • Identification of areas needing particular work - development of task-list • TOC meetings to discuss items and decide on first draft • First draft of reports (when dependent on specific TOC) and discussions T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a
2010 TEAP and TOC Assessment Reports • Timeline of Work: 2010: • Further compilation and update of necessary information • Report drafting (new drafts) • TOC meetings or CLA-TOC meetings to discuss drafts • Preparation of review drafts (and possible external review) • Final discussion of comments and review comments (TOC meetings) • Finalisation of TEAP report • Submission of reports by 31 December 2010 T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a
CTOC 2010 Assessment Report • Process Agents (as a follow up to XVII/6) • Laboratory and Analytical Uses • nPB; Overview of updates (in response to Decision XIII/7) • Feedstocks and emissions from feedstocks • Reconciling bottom-up CTC emissions versus emissions derived from atmospheric measurements • Use of solvents and non-medical aerosol propellant applications • Update on destruction technologies T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a
FTOC 2010 Assessment Report • Report on transition to zero ODP options in Article 5 and non-Article 5 Parties • Review status of proven in-kind technologies (HCs, HFCs) to replace HCFCs in foam and comparison with not-in-kind options • Evaluation and validation of methodologies to estimate the impact on climate change of HCFC phase-out projects (LCCP, Functional Units, GWP) • Validation of emerging in-kind HCFC replacement technologies as potential alternatives tohigh GWP HFCs and hydrocarbons (HCs) including: methyl formate, HFC(HFO)-1234ze, other liquid HFCs (HFOs) • Evaluation of pilot projects to assess the emerging technologies • Update size of banks and emissions of different ODP GHG blowing agents • Progress in bank management efforts T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a
HTOC 2010 Assessment Report • Update of halon supply and demand particularly with respect to airlines and Article 5 Parties • Assessment of the environmental and fire protection implications of over/ or under supply of halons and functionality of banking mechanisms to supply halons to ongoing critical needs T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a
MTOC 2010 Assessment Report • MDIs • Review of available technology • Global status of the MDI transition • Progress of transition in Article 5 Parties • Production of pharmaceutical-grade CFCs • Remaining challenges for phase-out of CFC MDIs • Sterilants • Review of available technology • Global status of the sterilant transition • Global use of HCFCs • Remaining issues for the phase-out of ODS in sterilisation T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a
MBTOC 2010 Assessment Report • A listing of alternatives successfully adopted in non A5 and A5 Parties for all uses, with particular emphasis on remaining critical uses • Technical, economic and regulatory constraints to the adoption of alternatives to MB for remaining uses (non A5 and A5) • The contribution of MB phase-out to ozone layer protection, human health, sustainable development and the impact of alternatives on climate change, particularly in A5 Parties • An update on the technical and economic feasibility of emission reduction, recovery, reuse and destruction of MB • An analysis of QPS uses • Case studies on adoption of alternatives T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a
RTOC 2010 Assessment Report • Report on transition to zero ODP options in Article 5 and non-Article 5 Parties • Review status of replacement technologies (HCs, HFCs, CO2, others) for HCFCs in the refrigeration and AC sub-sectors, specifically commercial and large size refrigeration, unitary AC and chillers • Review status and developments in sub-sectors which have already transitioned to non ODS solutions • Evaluation and validation of methodologies to estimate the impact on climate change of HCFC phase-out projects (LCCP, Functional Units, GWP) • Update size of banks and emissions of different refrigerants in the different refrigeration and AC subsectors T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a
TEAP 2010 Assessment Report The TEAP 2010 Assessment report will consist of: • An executive summary of the executive summaries of all TOC assessment reports (and will contain all executive summaries of the TOC reports) • Specific assessment of new developments and issues important for the 2010 Synthesis with the SAP and EEAP Assessment Reports T E A P a n d T O C s - A s s e s s m e n t 2 0 1 0, M O P - 20, D o h a