100 likes | 286 Views
Why a schedule of fees for cadastral surveying Dipl. Ing. Dieter Seitz, BDVI. Why we need a schedule of fees for surveying services?. We need guaranteed quality for private persons and We have a unequal competition between the state and private surveying companys . Time fees. Advantage
E N D
Why a schedule of fees for cadastral surveying Dipl. Ing. Dieter Seitz, BDVI
Why we need a schedule of fees for surveying services? We need guaranteed quality for private persons and We have a unequal competition between the state and private surveying companys
Time fees Advantage All expenses are remunerated Drawbacks The costs of surveying is not able to estimate The costs are depend by the performance on the job The costs are depend by the quality of the land register It is easy to rig a price (more or less houres) Risk of dumping offers Investments in modern equipment / Computers / Software / new surveying methods are not profitable .
Equivalence fees Costs only depend on the value of the property As an example the schedule of fees for the building surveys in Baden-Württemberg Building with value 0-25.000 € fee 100 € Building with value 25.000-100.000 € fee 200 € Building with value 100.000-400.000 € fee 300 € Building with value 400.000-800.000 € fee 500 € Building with value 800.000-2.000.000 € fee 800 € Building with value 2.000.000-5.00.000 € fee 1.200 €
Equivalence fees Advantage Arising costs can be estimated for a offer Costs do not depend by the performance on the job Costs do not depend by the quality of land register Fees cannot be manipulated Investments and innovations are profitable for the office Acceptance of fees is better by the clients Drawbacks Some services (low value) are not cost-effective
Hybrid types of fees Hybrid types of fees have elements of time fees and equivalence fees Example the fees for land parcel partition in Baden-Württemberg Following parameters are taken Land value / sqm Equivalence fees Number of partial areas Expence fees numbers of new landmarks Expence fees
New border point Origin parcel Parcel 1 Parcel 2 New border point
Hybrid types of fees the fees for land parcel partition in Baden-Württemberg as example Origin parcel 1 1 * 150 € New Parcel 2 2 * 230 € New border points 2 2 * 40 € Summary 690 € Value of Land 0-10 € factor 1 690.00 € Value of Land 10-100 € factor 1.5 1035.00 € Value of Land 100-300 € factor 2.25 1552.50 € Value of Land > 300 € factor 3.0 2070.00 €
One common fee for all participants is needed The fee must used from all surveyors (private and state) The fee must be obligatory for all surveyors The fee must be developed together Controlling of the practice of the fees is needed