1 / 23

PRR on Patch-Panel ASIC 9 Dec. 2002 KEK SOS

PRR on Patch-Panel ASIC 9 Dec. 2002 KEK SOS. Overview LVDS Rx Variable Delay BCID Test Pulse Generator Control Radiation tests Mass-production and inspection. Overview. Requirements Receives LVDS differential signals from two ASD Boards (2 x 16-ch) BCID

ophrah
Download Presentation

PRR on Patch-Panel ASIC 9 Dec. 2002 KEK SOS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRR on Patch-Panel ASIC9 Dec. 2002 KEK SOS • Overview • LVDS Rx • Variable Delay • BCID • Test Pulse Generator • Control • Radiation tests • Mass-production and inspection

  2. Overview • Requirements • Receives LVDS differential signals from two ASD Boards (2 x 16-ch) • BCID • Variable delays (common for 16-ch signals from a ASD Board) for phase adjustment, variable delays for the clock • Effectively wider gate width than 25 nsec • Variable delays • 25 nsec dynamic range with a step of sub-nano sec. • Two Test Pulse Generators for two ASD Boards with variable amplitude and variable delay • JTAG Control • Process • 0.35 mm full-custom CMOS (Rohm)

  3. Block Diagram of Patch-Panel ASIC

  4. LVDS Receiver (I) • Propagation delay vs. amplitude and offset voltage

  5. LVDS Receiver (II) • Dependence on supply voltage

  6. Variable Delay (Block Diagram)

  7. Delay of 32 delay units vs. VCON

  8. Dynamic Ranges and Steps of the Variable Delay

  9. Chip variation of the delay

  10. Dependence on supply voltage

  11. Dependence on ambient temperature

  12. BCID Circuit

  13. Effective Gate Width (26 – 48 nsec)

  14. Test Pulse Generator

  15. Supply voltage dependence of the amplitude

  16. Control via JTAG • BYPASS, No Boundary Scan • TRST_ is not supported. • BCID (Port-A and Port-B) • Mask, Signal Delay, BCID CLK Delay, Gate Width • Test Pulse (Port-A and Port-B) • Amplitude, Fine Delay, Coarse Delay • Debug Variable Delay • SEU flag

  17. Control via input pins • POL • Set whether anode or cathode signals • PLL • ENB, ENV, ENP, SELECT_ENP (test purpose) • STEP0, 1:The number of Delay Units in PLL • STEP decides the dynamic range and a step of the Variable Delay • BCID skip (BYPASS) • Test Pulse Trigger (TPTRG) • RESET_ • Reset all the register to the defaults. • Initiate PLL lock sequence

  18. Radiation Environment (Patch-Panel ASIC) • TID RTC=10.5 krad • SFsim=3.5, SFldr=5, SFlot=2 • RTC=0.3 (Gray/y) x 3.5 x 5 x 2 x 10 years = 105 Gray • Simulated Radiation Level (SRL) for SEE • SRL = 2.11 x 1010 h/cm2/10years • Rohm 0.35mm CMOS Process • The same process with SLB ASIC • We can deduce the radiation effect from the result of SLB ASICs. • The voting logic is used to all the instruction and data registers.

  19. Radiation Test (TID) • Research Center for Nuclear Science and Technology (RCNST) in Univ. of Tokyo (26 Nov. 02) • 60Co, 0.954 krad/min., 4 samples • 30, 30, 30 and 85 krad • Biased during irradiation • Current measurement • The increase of the current can be observed at more than 30 krad. • Functionality checks before/after irradiation • No functional defect was observed in all 4 chips.

  20. DC current (TID)

  21. Radiation Test (SEE) • AVF Cyclotron at CYRIC of Tohoku Univ. • Proton beam: E=70 MeV, I=2-4 nA • Beam Fluence and profile using dosimetry • 0.1mm thick Cu foil put on the DUT • Gamma-ray spectra from activated radioisotopes will be measured using a Ge detector. • Intensity distribution of the g-ray will be measured with an Imaging Plate. • 4 ASICs will be tested. • Beam time is 17-18 Dec. (48 hours)

  22. Mass-Production • 10,368 + spares = 15,000 working chips • The re-production of the mask will dominate the price. • Combine the mask and mass-production with other ASICs • JRC ASIC (5 mm x 5 mm, 1600 chips) • SLB ASIC (10 mm x 10 mm, 3000 chips) • Rohm has started their consideration how to proceed the mass-productions. • International Tendering in summer 2003 • Completion of the mass-production by the end of 2003

  23. Inspection • At IC production line (Rohm) • Need negotiations, but they are hesitating. • DC parameters (DC currents) • At KEK • AC measurements • PPGs, FIFO Modules and PT4 modules in VME • Development of a Test Board and software • Comprehensive tests should be done as a PS-Board • 2 [person X month] • Manpower for inspection

More Related