An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Current Project Update October 25th 2012 Good Evening!!!

  2. NW Old Tiffany Springs Road Tiffany Ridge Elementary Now Open!!! Anticipating:

  3. NW Old Tiffany Springs Road Park Hill High School Current Projects: • Cafeteria Expansion – Now Open! • Counseling Remodel – Now Open! • Conference Room – Now Open! • Classroom Addition – Dec 2012 Cafeteria Expansion Future Projects: • Restroom Remodel! (13) • Electrical Upgrades • Mechanical Replacement • Roofing Classroom Addition Science Casework

  4. NW Old Tiffany Springs Road Congress Middle School Current Projects: • Interior Remodel – Now Open! • Science Labs (2) • Speech/Publications Room • Band Room • Classroom Addition (6) – Dec 2012 • Parking Lot Flow Revision – Dec 2012 Classroom Addition Rendering Future Projects: • Gym HVAC • Roofing Classroom Addition Floor Plan Classroom Addition Construction

  5. NW Old Tiffany Springs Road English Landing Elementary Current Projects: • Secure Entrance Addition – Aug 2013 • Administration Addition – Aug 2013 • Classroom Remodel (2) – Aug 2013 New Entrance Rendering Future Projects: • Exterior Concrete Replacement • Roofing • Kitchen HVAC • Electrical Service Surge Protection Addition Floor Plan

  6. NW Old Tiffany Springs Road Lakeview Middle School Current Projects: • Secure Entrance Addition – Aug 2013 • Administration Addition – Aug 2013 • Classroom Remodel (2) – Aug 2013 New Entrance Rendering Future Projects: • Exterior Concrete Replacement • Revise Parking Lot Circulation • Roofing • Carpet Replacement • Electrical Surge Protection • Upgrade the Building EMS Addition Floor Plan

  7. Union Chapel Elementary Current Projects: • Secure Entrance – Aug 2013 • Canopy – Aug 2013 • Administration Remodel – Aug 2013 New Entrance Rendering Future Projects: • Restroom Remodel! • Flooring Replacement • Media Center Circulation Desk • Media Center Exterior Door and Windows • Electrical Upgrades • Mechanical Upgrades Addition Floor Plan

  8. NW Old Tiffany Springs Road Park Hill South High School Current Projects: • Classroom Add w/ Link – Aug 2013 • Cafeteria Expansion – Aug 2013 • Locker Room Addition – Aug 2013 • Special Ed Addition – Aug 2013 • Nurse Remodel – Aug 2013 Classroom Addition & Link Rendering Future Projects: Addition Floor Plan • Exterior Concrete • Bell Tower • Soccer Stadium foul ball protection • Carpet Replacement Bell Tower Rendering

  9. NW Old Tiffany Springs Road Renner Elementary Current Projects: • Canopy – Aug 2013 New Entrance Canopy Rendering Future Projects: • Restroom Remodel! • Nurse’s Office Remodel • Kitchen HVAC Upgrades • Electrical Upgrades • Carpet Replacement Existing Entrance

  10. NW Old Tiffany Springs Road Plaza Middle School Current Projects: • Parking Lot Future Projects: • Restroom Remodel! • Electrical Upgrades • Kitchen HVAC • Replace Boiler • Roofing • Replace Carpet

  11. NW Old Tiffany Springs Road Southeast Elementary Current Projects: • Parking Lot Future Projects: • Restroom Remodel! • Electrical Upgrades • Kitchen HVAC • Replace Carpet • Boiler Replacement • Parking Lot Revision

  12. Current Project Update October 25th 2012 Thank You!!!