Chapter 2. Job Order Costing. Learning Objective 2-1. Describe the key differences between job order costing and process costing. Job Order versus Process Costing. Process Costing. Average Unit Cost. Total Manufacturing Cost Total Units Produced. =.

orea
Download Presentation

Chapter 2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapter 2 Job Order Costing

  2. Learning Objective 2-1 Describe the key differences between job order costing and process costing.

  3. Job Order versus Process Costing

  4. Process Costing AverageUnitCost Total Manufacturing Cost Total Units Produced = Costs are traced to the process and then divided by units produced to obtain an average unit cost.

  5. Manufacturing Cost Categories DirectLabor DirectMaterials ManufacturingOverhead

  6. Assigning Manufacturing Costs to Jobs

  7. Learning Objective 2-2 Describe the source documents used to track direct material and direct labor costs to the job cost sheet.

  8. Materials Requisition Form

  9. Direct Labor Time Tickets $700 charged to Job 2719 $300 charged to Job 3335

  10. Learning Objective 2-3 Calculate a predetermined overhead rate and use it to apply manufacturing overhead cost to jobs.

  11. Job Cost Sheet ? Manufacturing overhead is assigned to specific jobs using a predetermined overhead rate, our next topic.

  12. Predetermined Overhead Rates Manufacturing overhead is applied to jobs that are in process. An allocation base, such as direct labor hours, direct labor dollars, or machine hours, is used to assign manufacturing overhead to individual jobs. • We use an allocation base to apply manufacturing overhead because: • It is impossible or difficult to trace overhead costs to particular jobs. • Manufacturing overhead consists of many different items ranging from the grease used in machines to a production manager’s salary. • Actual overhead for the period may not be known until the end of the period.

  13. The predetermined overhead rate (POHR) used to apply overhead to jobs is determined before the period begins using estimates. Predetermined Overhead Rates Estimated TotalManufacturing Overhead CostEstimated Total Cost Driver PredeterminedOverhead Rate = Ideally, the allocation base is a cost driver that causes overhead.

  14. Because home building is a labor intensive business, Toll Brothers uses direct labor hours as the overhead allocation base. Toll Brothers estimates the total manufacturing overhead cost for the year to be $750,000, while direct labor hours are estimated to be 10,000. What is Toll Brothers predetermined overhead rate? $750,000 POHR = 10,000 direct labor hours (DLH) Predetermined Overhead Rates POHR = $75.00 per DLH For each direct labor hour worked on a job, $75.00 of manufacturing overhead will be applied to the job.

  15. Predetermined Overhead Rates Based onestimates, and determined before the period begins. Actual Cost Driver Applied Manufacturing Overhead PredeterminedOverheadRate × = Actualamount of thecost driversuch as units produced, direct labor hours, or machine hours incurred during the period.

  16. Predetermined Overhead Rates PredeterminedOverheadRate $75 Actual Direct Labor Hours for Job 2719 300 DLH OverheadAppliedto Job 2719 $22,500 × =

  17. Predetermined Overhead Rates 12

  18. Learning Objective 2-4 Describe how costs flow through the accounting system in job order costing.

  19. Flow of Manufacturing Costs inJob Order Costing

  20. Record the Purchase and Issue of Materials Toll Brothers purchased $150,000 in raw materials on account. Toll Brothers withdraws $150,000 worth of materials from inventory, $100,000 for Job 2719 (Simpson home), $40,000 for Job 3335 (Flintstone Home), and $10,000 for supplies. DirectMaterials IndirectMaterials

  21. Record Labor Costs Toll Brothers incurs $55,000 in labor costs, $30,000 for Job 2719 (Simpson home), $20,000 for Job 3335 (Flintstone Home), and $5,000 for indirect labor. Labor Costs IndirectLabor DirectLabor

  22. Record Applied Manufacturing Overhead

  23. Transfer Costs to Finished Goods Inventory and Cost of Goods Sold Summary section of job cost sheet for Job 2719 after all costs are updated.

  24. Transfer Costs to Finished Goods Inventory and Cost of Goods Sold Assume Job 2719, the Simpson home was sold.

  25. Record Actual Manufacturing Overhead • In addition to indirect materials and indirect labor, Toll Brothers incurs other manufacturing overhead costs including: • Salary paid to construction site supervisor, $12,000. • Salary owed to a construction engineer, $8,000. • Property taxes owed but not yet paid, $6,000. • Expired insurance premium for construction, $4,000. • Depreciation on construction equipment, $18,000.

  26. Record Nonmanufacturing Costs In addition to manufacturing costs, Toll Brothersincurs non-manufacturing overhead costs. Commissions to sales agent, $20,000. Advertising expense, $5,000. Depreciation on office equipment, $6,000. Other selling and administrative expenses, $4,000. These non-manufacturing costs would be recorded in individual expense accounts, including commission expense, advertising expense, depreciation expense, and other expenses. The total of the selling and administrative expense would be subtracted from gross margin on the income statement.

  27. Calculate Overapplied and Underapplied Manufacturing Overhead Actual Applied MOH MOH / = The difference is closed to cost of goods sold.

  28. Calculate Overapplied and Underapplied Manufacturing Overhead

  29. Learning Objective 2-5 Calculate and dispose of overapplied or underapplied manufacturing overhead.

  30. Disposing of Overapplied and Underapplied Overhead The most common method for disposing of the balance in Manufacturing Overhead is to make a direct adjustment to Cost of Goods Sold. DecreasesCost of Goods Sold OverappliedManufacturingOverhead(credit balance) IncreasesCost of Goods Sold UnderappliedManufacturingOverhead(debit balance)

  31. Disposing of Overapplied and Underapplied Overhead

  32. Summary of Recorded Manufacturing and Nonmanufacturing Costs

  33. Learning Objective 2-6 Calculate the cost of goods manufactured and cost of goods sold.

  34. Cost of Goods Manufactured Report Notice that Cost of Goods Sold is based on applied (not actual) manufacturing overhead.

  35. Cost of Goods Manufactured Report From the Cost of Goods Manufactured Report

  36. Learning Objective 2-7 Apply job order costing to a service setting.

  37. Job Order Costing in a Service Firm Job order costing is used in many professional service firms, including accounting firms, law firms, advertising and public relations firms, architectural and engineering firms, and health care providers. All of these businesses offer specialized services to clients that tend to have different needs or demands.

  38. Job Order Costing in a Service Firm Because service firms tend to be labor intensive, the primary driver used to assign cost is billable hours. A billable hour is the time that can be directly attributed to a specific client and is equivalent to direct labor hours in a manufacturing setting. In professional service firms, each employee keeps track of how much time is spent on each client so that the client’s account can be charged for that cost.

  39. Job Order Costing in a Service Firm Service firms incur many other indirect costs that cannot be traced to specific clients or accounts. Examples include the non‐billable time that employees spend on activities such as training, paperwork, and supervision; the salaries of administrative personnel; rent and utilities for the corporate office; and infrastructure costs such as computers, networks, and the like. These indirect costs are treated just like manufacturing overhead in a factory. They get assigned to individual clients or accounts based on an allocation base, or cost driver, such as billable hours (for an accounting firm) or the number of patient days (for a hospital).

  40. Supplement Chapter 2A Journal Entries for Job Order Costing

  41. Learning Objective 2-S1 Prepare journal entries to record the flow of manufacturing and nonmanufacturing costs in a job order cost system.

  42. Recording the Purchase and Issue of Materials Toll Brothers purchased $150,000 of raw materials on account. The company issued $100,000 of raw materials to Job 2719 and $40,000 to Job 3335. Indirect material of $10,000 were issued.

  43. Recording Labor Costs The following labor costs were incurred during the period.

  44. Recording Applied Manufacturing Overhead Here is how we applied overhead during the period.

  45. Transferring Costs to Finished Goods Inventory and Cost of Goods Sold Job 2719, the Simpson home, was completed at a cost of $175,000. The Simpson home was purchased for $275,000 cash.

  46. Recording Actual Manufacturing Overhead The following overhead costs were incurred during the period.

  47. Recording Nonmanufacturing Costs Toll Brothers incurs non-manufacturing overhead costs. Commissions to sales agent, $20,000. Advertising expense, $5,000. Depreciation on office equipment, $6,000. Other selling and administrative expenses, $4,000.

  48. Overapplied or Underapplied Manufacturing Overhead At the end of the period, Toll Brothers has a $3,000 debit balance in the Manufacturing Overhead account (underapplied overhead).

  49. End of Chapter 2