An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AB/CO Industrial Systems Section Restructuration Issues Activitiesto Maintain, Pursue,Develop Priorities & Resources Organisation C.H.Sicard 4 Sept 2002

  2. Restructuration Issues • Maintain good collaboration with present LHC client groups (mainly MTA, MMS, ACR, ECR) • Rationalize activities inside AB/CO group • HW Installation • Exploitation • Expand Industrial Automation support to AB Equipment groups C.H.Sicard

  3. Activities: Cryo Controls • UNICOS Contract management (GTD,Cegelec) • UNICOSFramework, Integration to CERN Network • UNICOS application development support for: • LHC-ECR (Experiment Cryogenics), LHC-ACR (tunnel) • UNICOS for String2 [04/2003] • UNICOS application development for LHC-ACR cryoplants • ABB Controls (Legacy) • HW & application support for: North Area (COMPASS, NA49, LHC tests), 1.2KW refrigerator, CAST,Coldex [->2005]; Central Liquefier • HW support + application development/maintenance for LHC-ACR: 6KW refrigerator & test facilities LHC Operation[->2005-2006] 18KW refrigerator [->2005-2006] C.H.Sicard

  4. Industrial Controls Supervision • Existing Supervision Projects • String2 (till mid-2003 at the latest) • Magnet Test benches (till 2006) • Older projects?[HTS current leads supervision, QRL test] • Quench Protection System (QPS) Supervision • Porting UNICOS supervision layer to PVSS • PVSS Support for Equipment groups (VAC,...) C.H.Sicard

  5. Magnetcold measurements/tests • Developments for the series tests [2003] : ØFinish existing applications, Test Master (schedule acquisition & test applications), Resource Manager (detect equipment items specifics) ØCustomise and improve applications for all types of cold masses, equipment, and tests : SSS, correctors ØDefine troubleshooting procedures, write user manuals, train MTA technical staff => reliable control and acquisition for series tests • Maintenance in 2004-2006 Ensure troubleshooting for the series test 24h/24, 10.5 months a year • New projects Multipole factory and reference magnets,2nd generation insertion magnets,Long-term developments ?? C.H.Sicard

  6. Magnet series production support • Program Support of equipments for the magnetic measurements of dipoles and quadrupoles in the firms • SW for periodic calibration in firms and at CERN of the measuring moles /magnetic measurements and alignment. • Program Support of the Laser Trackers for alignment tasks & magnetic axis measurements. • Produce user manuals & train the technical staff • Maintain software in firms (able to intervene @ short notice) C.H.Sicard

  7. PLC/Fieldbus [Siemens – Schneider] • Validate/Test PLC-Fieldbus architecture & components • Radiation tolerance, clock synchronisation, integration of non-homogeneous systems, Web-based diagnostics/commissioning • Implement/maintain PLC Applications for Eq Groups • Anticryostat regulation, bench security, motor control • FieldBus Support • Prepare installation, validation, diagnostics (in collaboration wih HW section) • Design components for CERN applications • ACR/IN: FIP agent programming, EtherFIP Gateway, PLC • ICP/QPS: FIP support for new AMC • Promote development methods for all PLC-based projects C.H.Sicard

  8. Other projects • Isolde Rejuvenation with PLCs (F.Locci) • Developments till end 03/2003 • LHC Power Interlock systems (B.Puccio) • 36 controllers, PLC-based • 4 systems operational for Sector Test (03/2005) • LHC Beam Interlock systems (B.Puccio) • 16 units, Base to be defined (VME,PLC,CPCI) • Required for Injection Tests [04/2006] • Can be used forr SPS Interlock [from 09/2003] C.H.Sicard

  9. Collaborations with other sections (non exhaustive) C.H.Sicard

  10. AB/CO Group Organisation • Steering Board meetings (Tuesday mornings) • Section meetings Wednesday morning • General info ~1/month • 1 technical, every 2 weeks • Technical Coordination (Thursdays) • Web site ab-co-tc • B.Frammery: Thursday afternoon at B.35 C.H.Sicard