10 likes | 219 Views
CERNER LAB UPGRADE WITH HEO/WIZ DOWNTIME Saturday, September 28 th , 1000 am – 1200 noon . Total 2-Hour Housewide Downtime for HEO/Wiz & VOOM planned The Laboratory will be operational & test results will be sent to StarPanel during the downtime
E N D
CERNER LAB UPGRADE WITH HEO/WIZ DOWNTIME Saturday, September 28th, 1000 am – 1200 noon • Total 2-Hour Housewide Downtime for HEO/Wiz & VOOMplanned • The Laboratory will be operational & test results will be sent to StarPanel during the downtime • This downtime is necessary to upgrade the current GE/GGG product to Cerner • Actions Required: • Pre-Downtime (day of downtime): • Round early & order labs to be sent prior to 1000 (if appropriate) • Minimize or avoid ordering serial labs before 1000 I can wait until after 1200 • Reorder Restraints and Pain meds • Order TPN (much easier in HEO than on paper!) • During Downtime: • Downtime Orders written on STAMPED (label or blue card) downtime physician order sheet (see example posted on each unit) • Lab will have a central number to receive questions during downtime 5-LABS • After Downtime: • All repeating and future lab orders in HEO/Wiz will be discontinued & re-entered by support staff to allow HEO and VOOM to communicate the order to Cerner lab system (No action required by provider) • Lab orders will be re-entered as written orders to avoid the need for multiple co-signatures, BUT some orders may inadvertently get entered prompting a co-signature – please co-sign • New Reference Ranges will be available in StarPanel labs section on day of go-live • A redline will display in StarPanel to indicate where the reference range changed to alert providers when looking at trends • Pediatric reference ranges changes will be more extensive • Resources: • 3-HELP – to get SSS • VUMC Lab to see new reference ranges: www.lab.vu.com