60 likes | 223 Views
Authors (if more than one), Presenter. Title. Period covered by this report. North Carolina State University Wireless Ad Hoc and Local Area Networks. Outline. Tasks accomplished. Tasks underway. Other. Plans for next week. Tasks accomplished.
E N D
Authors (if more than one), Presenter Title Period covered by this report North Carolina State UniversityWireless Ad Hoc and Local Area Networks
Outline • Tasks accomplished. • Tasks underway. • Other. • Plans for next week.
Tasks accomplished. • Rebuilt the circuit as per our discussion last week. Shifted the circuit to a bigger bread-board, since there were in all 7 ICs. • Completed the software routine. Did simulations in AVR Studio to ensure that the duration of the line-display was close to 52.5 usec.
Tasks underway • To get the software running using the uC /circuit. Issues: On downloading the software to the STK, the expected pattern did not show up on the TV. Possible Causes: Incorrect circuit connections? ( 7 ICs!!) Incorrect Software? Is the timing diagram correct?
Other • Now completely moved over to EGRC lab, really a good quiet environment with all the required facilities. • Laptop has all the required software, Wireless card should arrive tomorrow.
Plans for next week. • Get the hardware and software to work together. Test on the TV. • Look into optimizing the Asteroids game/Glib. This will lead into the next phase. (Steps: 1. Optimizing Asteroids/Glib, 2. Hand-integrating the threads). • Need to plan-out exactly what is to be achieved for the ISCA paper, and make a timetable for that.