1 / 10

Edinet EVO Meeting June 26, 2008

Edinet EVO Meeting June 26, 2008. VSB-CZ, WP3 Interim Progress Report Prepared by: Petr Gryg áre k. What was done by WP3 (from last EVO meeting). SVC implementation is just before completion (CP, Lab GW)

orpah
Download Presentation

Edinet EVO Meeting June 26, 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Edinet EVO MeetingJune 26, 2008 VSB-CZ, WP3 Interim Progress Report Prepared by: Petr Grygárek

  2. What was done by WP3(from last EVO meeting) • SVC implementation is just before completion (CP, Lab GW) • Remote access, Noticeboard+Reservation system, Access to task documents, Supporting Systems • Only dummy authentication is implemented now, we wait for UBE-CH’s Shibboleth integration solution • Extensive testing is necessary • Creation of simulated distributed environment for internal testing • simulates two partner’s labs and CP • http://edinet.cs.vsb.cz/index.php/Internal_Testing_Environment

  3. Internal Testing Environment

  4. Implemented supporting systems • Prototype of Configuration Clearing Controller • Power-cycling using Power Switch Controller • http://edinet.cs.vsb.cz/index.php/Configuration_Clearing_Controller • Prototype of Power Switch Controller • Encapsulates single APC AP-7952 power switch • http://edinet.cs.vsb.cz/index.php/Power_Switch_Controller • Simple prototype of Linux-based Terminal Server • http://edinet.cs.vsb.cz/index.php/Linux-based_Terminal_Server

  5. Nearest Planned WP3 Work • Extensive testing on Internal Testing Platform • to correct as many bugs as possible before real piloting starts • Completion of installation documentation • Input for WP6 • SVC SVN may be made accessible from outside of VSB-CZ now • Suggestion for other partners how to adapt their labs for SVC • only basic ideas, detailed plan is in competence of WP6

  6. Non-WP3 activities • Dissemination • Article about SVC architecture ("ARCHITECTURE OF SEMI-VIRTUAL CAMPUS FOR EDUCATION IN DISTRIBUTED DATA NETWORK LABORATORY“ accepted for ICETA conference • “Integration of Computer Networks Laboratories in Context of European Commission Project Edinet". Seminar Modern Computer Network Technologies and Embedded Systems for Communications (29.5.2008, VSB-TU Ostrava) • 7th Annual Netacad conference, Stará Lesná (SK), 12.-14.6.2008 - Edinet mentioned in Virtlab presentation "Distributed Virtual Networking Laboratory Environment for NetAcad“ • WP2: • Final version of task on BGP route optimization in Edinet format was prepared

  7. Questions to solve • Final decision who will host/maintain/patch Common Portal during piloting phase • FHJ-AT ? • What information does WP4 need to prepare printable versions of SVC usage manuals for various user roles ? • Please start with SVC architecture design specification • http://edinet.cs.vsb.cz/index.php/SVC_Technical_Infrastructure_Architecture_Design • Familiarize with Common Portal GUI (edinet-cp.cs.vsb.cz) of internal testing platform • (see http://edinet.cs.vsb.cz/index.php/Internal_Testing_Environment)

  8. What do we need from other partners/WPs (1) • FHJ-AT • Bugtracking system configured according to our specification • http://edinet.cs.vsb.cz/index.php/Bugtracking_system • Developing of scripts for easy replication of Management Network VPN Gateways • in cooperation with WP3 staff • Definition of security measures for production Common Portal and Lab Management Network VPN Gateways • acessible permanently from any place of the Internet • hosted on Linux Debian/Etch • Example configuration of OpenVPN virtual L2 topology link(s) for Linux-based Topology VPN gateways • Use http://edinet.cs.vsb.cz/index.php/Remote_Access_and_Lab_Interconnection#Lab_Interconnection_Implementation_Example examle topogy • IT-FI • CSSs for Common Portal and application for user account management (will be created by UBE-CH) • WP3 will inform IT-FI after internal testing finishes (beginning of July)

  9. What do we need from other partners/WPs (2) • UBE-CH • Implementation of Shibboleth Identity Provider • Implementation of authentication and getting user attributes from respective Identity Provider into Common Portal AAA function (dummy now) • Implementation of WWW GUI for management of user accounts (user attributes) on Local AAA Servers (Shibboleth with Identity Providers) • See http://edinet.cs.vsb.cz/index.php/Implementation_of_AAA_Infrastructure for detailed specification

  10. Thank you for your attention.Questions ?

More Related