1 / 3

L1Muo Status

L1Muo Status. Jeff Temple University of Arizona for the L1 Muon Group. L1Muo Hardware. Immediate post-shutdown L1Muo All MTC05 (L1CTT and muon scintillator match) cards All Central MTC10 (PDT and muon scintillator match) cards

orrin
Download Presentation

L1Muo Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. L1Muo Status Jeff Temple University of Arizona for the L1 Muon Group

  2. L1Muo Hardware • Immediate post-shutdown • L1Muo • All MTC05 (L1CTT and muon scintillator match) cards • All Central MTC10 (PDT and muon scintillator match) cards • North plus some fraction of South MTC10 cards (MDT and muon scintillator match cards) • MCEN • Central, North, and South MCON (scintillator hit concatenation) cards • All layer North and South A-layer MCEN (MDT centroid-forming) cards • Both L1Muo and MCEN are working hard on readout glitches -- success by shutdown end is expected

  3. L1Muo Software • Pete Johnson is a hero • L1muo_analyze package works on data (and Monte Carlo) • Raw data can be processed through tsim_l1muo • In theory can begin data-Monte Carlo comparisons but • Need to implement post-shutdown scintillator only/PDT only trigger logic in simulator • DebugChunk added to help sort through the rubble • Beginning to come to grips with versions, definition changes, etc. • Targeting download via Comics for shortly after shutdown • Online monitoring software exists

More Related