Joint Exchange / Interop Work Group Test Workgroup. Eric Heflin/Judith Huntman /Ed O’Connor. Aug 8, 2012. Agenda. Roll Call – Admin Announcements – Eric (5 mins ) ‘Round-the-Room for Harmonized Specs – Eric (10 mins )
E N D
Joint Exchange / Interop Work Group Test Workgroup Eric Heflin/Judith Huntman/Ed O’Connor Aug 8, 2012
Agenda • Roll Call – Admin • Announcements – Eric (5 mins) • ‘Round-the-Room for Harmonized Specs – Eric (10 mins) • Phased Approach to Harmonization for Remaining Specs – Judith/Ed (10 mins) • ‘Round-the-Room for Phasing Approach – Eric (10 mins) • Test Execution and Test Architecture – Ed (10-15 mins) • Definition of Done – Ed (5 mins) • Test Case Metrics – Ed (7 mins) • Open Discussion – All • Wrap Up - Eric • RFP Schedule Review - Eric
Announcements • Harmonized PRL (PD/QD/RD/MP/AF) Tests Are Drafted • No objections were received and are now candidates for “final” status • Future changes are possible, but will be incorporated into the next phase of test cases design and implementation • We will do a ‘round-the-room next on the status • Vote next week to consider the harmonized Phase I test specs final • RFP • Has 5 respondents • Bidder interviews have been conducted top few vendors • Analysis is nearing completion
‘round-the-room Can we vote next week to consider the harmonized test specifications (presented over the last few weeks) as final? The scope of this question is the harmonized specifications for Patient Record Lookup (aka Patient Discovery, Query for Documents, and Retrieve Documents + Messaging Platform and Authorization Framework).
Harmonization Phases Unified Test Process – Has Been Proposed
Phase II Work Plan: Direct Test Specs * More detailed status will be posted on the Wiki
Phase III Work Plan: Secondary Specs • Secondary Methods, Service Discovery, & Provider Directories
‘round-the-room What are your thoughts about the phased approach for harmonization? Do you object to the proposed approach?
Test Case Execution • Manual: Step-by-step instructions are included in written test packages • Draft tracking worksheet for execution methods • What tests are the best candidates for tooling? • SOAP UI as a component, review different uses of it • Other utilities/components to research? • What about the conformance checklists?
Architecture Review • Refresh on Reference Toolkit concept • Check-in on feedback to high-level Toolkit architecture • Assumptions on prioritization at utility level • Message simulation for High test cases in PD/QD/RD • Proof of concept of lightweight orchestration (BDD layer) • Integration of NIST content tools (c32 then CCDA) • Ideas/volunteers for utilities, modules, or approaches? • Definition of “done” • Metrics for SOAP UI scripts
Open Discussion Other topics?
RFP Schedule Review • RFP released — July 2nd • Questions received by 6 organizations • Answers distributed — July 13th • Bids due — July 20th • Expected award — August 15th • Contract start — TBD We are here