Chino Basin Watermaster

Chino Basin Watermaster. Large-Scale Storage and Recovery Program Master Plan Scope of Work July 24, 2003. Task Overview. Develop assumptions/criteria Develop alternatives Estimate hydrogeologic feasibility Refine alternatives Determine “value” of storage recovery

osman
Download Presentation

Chino Basin Watermaster

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chino Basin Watermaster Large-Scale Storage and Recovery Program Master Plan Scope of Work July 24, 2003

  2. Task Overview • Develop assumptions/criteria • Develop alternatives • Estimate hydrogeologic feasibility • Refine alternatives • Determine “value” of storage recovery • Report/workshops and Other

  3. Task 1 - Develop Planning Assumptions and Basin Operating Criteria • Revise asset inventory • Update local producer water supply plans and projections • Describe 500,000 acre-ft storage program • Finalize Task 1 Memorandum

  4. Task 2 - Develop Initial Storage and Recovery Operational and Facilities Alternatives • Describe in-lieu vs. export • Evaluate 4 Alt. incl. 4-Cities Pipeline • Evaluate CDA expansion • Replenishment obligation • Review storage and recovery prospects • CLWA • Others • Develop cost opinions for all alternatives • Support development of storage & recovery agreements

  5. Task 3 - Estimate the Hydrogeologic Feasibility of the Planning Alternatives • Review planning alternatives • Run groundwater simulations • Determine impacts on: • Groundwater levels • Hydraulic controls • Increase safe yield • Plume migration

  6. Task 4 - Refine Alternatives • Refine operations and facility descriptions • Stake holder meetings • Refine cost opinions • Prepare facilities description and cost estimate

  7. Task 5 - Determine "Value" of Chino Basin Storage-Recovery • Determine “value” • Producer-Specific Facilities Cost Approach • Regional Facilities Cost Approach • Avoided Cost Approach • Methodology to apportion benefits • Conduct workshop

  8. Task 6 - 8: Report Preparation and Workshops and Other • Prepare draft report • Conduct first workshop • Update draft report • Conduct second workshop • 24 meetings • Prepare final report