3. List of Customers Williston Basin
4. Services Directional Drilling
MWD/Gamma
MWD – Un Manned Vertical
Motors (3rd Party)
5. Why Un-Manned MWD in Vertical Section? Faster Drilling Time
No Lost time Running Slickline/Single Shot
Running Gyro to find out where the hole is
Better Control of Hole
Constant Toolface
More Survey Points
Benefit of taking a Survey every Connection if needed
Straighter Hole
Ability to correct any Deviation
Less Doglegs
Less Casing Problems
Less problems Running Casing in Straighter hole
Less Casing Wear in Vertical Section while drilling Laterals
Cost Savings
6. Why Un-Manned MWD in Vertical Section? Cost Savings
MWD Hands duration of Job
Perdiem for MWD Hands
Chance of running Single Shot and not getting Survey + Rig Time
(Time & Cost) Running a Gyro Survey after Vertical Section has been drilled
Nearly ½ the cost of Manned MWD
7. Un-Manned MWD Procedures Rig-up & test tool on surface
Pick and insert in Non-Mag-Align w/Motor
Surface Test @ 500’
Trip to Bottom
Train all Crews (Drillers, Toolpusher & Company Rep) Steps to taking Surveys. Usually 1-2 days.
MWD Tech will be in area if needed for any problems or needs:
Further Training
Re-align tool to new motor
Tool problems
End of Job Tech will collect & download all data from tool along with Handwritten Survey Shot Sheet filled in by Rig of all shots taken by them.
Survey will be QC & Filed w/State
8. Pilot MWD System Specifications:
9. Pilot MWD Rig Floor Display Windows Based
Touch Screen
Wireless two-way communication