3 MeV measurement line

3 MeV measurement line. U. Raich Linac-4 Beam Coordination Committee 20.10.2009. Layout of the line. The BPMS. BPM Simulations. Simulations by J. Tan. BPM Simulations. Simulations: J. Tan. BPM simulations. Simulations: J. Tan. Status of BPMs.

overton
Download Presentation

3 MeV measurement line

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 3 MeV measurement line U. Raich Linac-4 Beam Coordination Committee 20.10.2009

  2. Layout of the line Uli Raich BE/BI

  3. The BPMS Uli Raich BE/BI

  4. BPM Simulations Simulations by J. Tan Uli Raich BE/BI

  5. BPM Simulations Simulations: J. Tan Uli Raich BE/BI

  6. BPM simulations Simulations: J. Tan Uli Raich BE/BI

  7. Status of BPMs • Mechanical drawing available but not approved yet • Simulations being done to determine resolution • Position • Intensity • Phase • Consequences of debunching being studied using Giulia’s optics simulations • 3 devices + electronics foreseen for June 2010 • 3 MeV measurement line will be used as test bench for all Linac-4 BPMs Uli Raich BE/BI

  8. Transformer Uli Raich BE/BI

  9. Status of Transformer • Drawings ready for approval • Workshop is informed • The ceramics are ordered (has longest delay) and will be delivered by March 2010 • 2 Devices ready by June 2010 • Will use same electronics as transformers at source and in LEBT • 3 MeV measurement line can be used to test new (and cheaper) electronics to be used for Linac-4 • EMC tests done with pulsing Quadrupole next to the transformer Uli Raich BE/BI

  10. BSM (Feschenko Monitor) Uli Raich BE/BI

  11. Status of BSM • Preliminary drawing available • Feschenko and collaborator will come to CERN 2.11 – 6.11 to discuss details • First inspection by Didier does not show any mechanical incompatibilities • Electronics and software specifications to be formalized • Device should be ready by the end of 2010 Uli Raich BE/BI

  12. Emittance Meter / SEMGrid Uli Raich BE/BI

  13. Status of Emittance Meter / SEMGrid • Emittance meter is currently installed on 3 MeV source • Consists of slit and grid in 2 tanks • Grid to be re-used • Slit about to be re-designed for higher than source energy (up to 12 MeV)Simulations have been made • Electronics ready • LabView program ready for testing in beam • Size problems for integration into the tunnel (sticks into transport zone) Uli Raich BE/BI

  14. SEMGrid in spectrometer line • Not yet clear if in/out mechanism is needed • In/out mechanisms do exist • Integration with dump to be studied • 1 plane of 0.5mm wire distance • Electronics solution is available but a new and cheaper one may be studied • Software to be specified and written Uli Raich BE/BI

  15. Halo Monitor Uli Raich BE/BI

  16. Halo Monitor • Device developed by M. Hori • Device is ready and was tested in beam • Commissioning in 3 MeV to be done • Take-over of responsibility for this device by CERN staff Uli Raich BE/BI

  17. Instruments in the measurement line • Transformers • 2 transformers in the straight section of the line • Design done, ready for approval • Halo Monitor • finished • Emittance Meter box • hor/ver slit (on 1 movement) • hor/verSEMGrids on 2 movements • will use the SEMGrids, movement and tank from source emittance meter • new, high energy slit under design • SEMGrid • retractable hor (possibly on movement) • BPMs • preliminary design done • BSM • preliminary design received from INR Uli Raich BE/BI

More Related