Madhyamgram Municipality

Madhyamgram Municipality. VISION. Madhyamgram municipality – exploring all its potential, is working towards its total development,touching Social,economic and cultural aspects Giving emphasis on regional importance To ensure long, healthy and meaningful life to all the citizens

owen
Download Presentation

Madhyamgram Municipality

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Madhyamgram Municipality

  2. VISION Madhyamgram municipality – exploring all its potential, is working towards its total development,touching • Social,economic and cultural aspects • Giving emphasis on regional importance • To ensure long, healthy and meaningful life to all the citizens • Extending the vision towards a sustainable development.

  3. CONTEXT • During Mughal regime Madhyamgram was known as “Majher Gaon” situated in Anwarpur parganas. • After the introduction of the three tire panchayet system in 1978 Madhyamgram panchayet was formed. • Madhyamgram municipality was first formed on 7th September 1993. • Finally, on 27th may, 1994 present municipality was formed comprising 17 mouzas which were further divided into 23 wards.

  4. DEMOGRAPHY • Total area - 21.73 sq. KM. • Population – 2001 – 155451 2012 – 209020 (projected) • 23 wards – highest population concentration in Wards 2,3,6,21, 22, 23 due to being situated along major transport network. Ward no 11, 12 are less dense for being located in the fringe areas • 65 slums with maximum concentration in Ward 10, 15, 19,1, 9,12,14

  5. INITIATING THE DDP • Meeting among all Councilors • This is an opportunity for capacity building therefore – all staff would be involved in the process • DPG and DTG (3) formed – functional delineation of responsibility but, close coordination in decision making – communication was key • Building on lessons learnt under CSIP 1c – participatory planning • CDS, TCGs, Health Workers, RCVs – extensively involved in community consultations – provided an insight into the houses of residents

  6. Launching workshop 1 Sensitization workshop 46 Planning workshop Component 1 – zonal meeting 7 Component 1 – prioritization meeting 7 Component 2 – FGD 5 Component 2 – prioritization 7 Component 3 – workshops 7 Component 3 – prioritization 3 BOC meeting 5 Public validation 1 THE PROCESS • Formal interactions • Many informal interactions

  7. THE STAKEHOLDERS • Citizens of Madhyamgram • Staff across ALL departments of municipality • CDS Groups, TCGs, RCVs, SGH members • Health workers. • Local Trade Associations • Informal Sector Workers • Pre Primary and Primary School staff • NGOs

  8. SURVEYS • Primary data collection • Technical survey for Component 1 • Socio economic survey • QSS • Economic Survey for LED • Citizens Satisfaction Survey • School survey • Health related survey

  9. OBSTACLES • Population pressure: This area is witnessing a fast development due to proximity to Kolkata attracting people from surrounding areas. • Unplanned city

  10. FOCUS OF THIS DDP • Livelihoods • Women’s empowerment • Public Health Delivery System • Institutional strengthening

  11. DEVELOPMENT GOALSComponent 1: Infrastructure, Land use and Environment Development • 1.1 Slum Infrastructure Improvement Plan • To ensure better quality of life by providing basic services • To ensure maintenance of the asset created • Enhance community participation in implementation and monitoring of various programmes

  12. IDENTIFIED PROJECTS1.1 Slum Infrastructure Improvement Plan • 5 slums out of 65 already supported by KUSP • Remaining slums except 9 being on service lands will be taken up on the basis of QSS • 11 slums will be supported from KUSP and 40 slums will be funded from BSUP • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs.2120.65 lac

  13. DEVELOPMENT GOALSComponent 1: Infrastructure, Land use and Environment Development • 1.2 Intra Municipal Infrastructure Improvement Plan • Ensure water connection to every household • Solid waste management • Elimination of water logging problem • Improving road network

  14. IDENTIFIED PROJECTS1.2 Intra Municipal Infrastructure Improvement Plan • Modernisation of solid waste management system • Improvement and construction of roads and drains • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs.2530.60 lac

  15. DEVELOPMENT GOALSComponent 1: Infrastructure, Land use and Environment Development • 1.3 Trans Municipal Infrastructure Improvement Plan • Conversion of present water supply system to treated surface water • Storm water drainage system

  16. IDENTIFIED Proposals1.3 Trans Municipal Infrastructure Improvement Plan • Construction of a drain at the side of Jessore road • Dredging and extension of Banikantha khal • Construction of a drain from Barasat municipality to CCI canal • Proposal for water perfusion and beautification of Noai • Repairing of Kora Panihara road • Improvement of a road started from Biswaspara to Barasat via 9 No. rail gate

  17. IDENTIFIED PROPOSALS1.3 Trans Municipal Infrastructure Improvement Plan • Improvement of road from Humaipur to Dakshinpara through Daspara • Jessore road widening and road over bridge at Madhyamgram and Barasat • Surface water treatment plant at garulia sewing Madhyamgram, Barasat, New Barrackpur • Water testing lab • Iron removing and Chlorination plant

  18. DEVELOPMENT GOALSComponent 1: Infrastructure, Land use and Environment Development • 1.4 Land use Development Plan • Making land available for various uses • Enforcement of regulation • Development of municipal owned land

  19. IDENTIFIED PROJECTS1.4 Land use Development Plan • Construction of an auditorium for indoor games • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 84 lakhs

  20. DEVELOPMENT GOALSComponent 1: Infrastructure, Land use and Environment Development • 1.5 Environment Management Plan • Conservation of water bodies • Shifting of hazardous industries from residential area • Regulation of industrial pollution • Spread awareness • Ensuring water harvesting

  21. IDENTIFIED PROJECTS 1.5 Environment Management Plan (SWM,SANITATION,ENVIRONMENT MANAGEMENT) • Construction of 4 pumping stations to remove the storm water • Construction of community latrine • Cleaning of drains regularly • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 192.00lac SWM RS 32 Lac SANITATION RS150 Lac ENVIRONMENT RS 10 Lac

  22. DEVELOPMENT GOALSComponent 2: Social and Livelihoods Development 2.1 Livelihood and Poverty Alleviation • Implementation of various poverty alleviation programmes of the government • Restructuring and empowering of UPE Cell

  23. IDENTIFIED PROJECTS2.1 Livelihood and Poverty Alleviation • Vocational training center to facilitate wage employment and self employment. • Capacity building of UPE Cell • Creation of a help desk for promotion of livelihood • Provision for micro financing for unemployed youth • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 100.1 lakh.

  24. DEVELOPMENT GOALSComponent 2: Social and Livelihoods Development 2.2 Local Economic Development • Utilisation of local resources • Creating infrastructure for local industry • Identifying employment opportunities for unorganised workers.

  25. IDENTIFIED PROJECTS2.2 Local Economic Development • Development of 3 markets in ward no. (1-5), (9-10), (11-12), (13-14), (14-15-16) • Development of KIOSK and marketing center for promotion of SHG products. • Implement entrepreneurship development programme • Service center on computer application, financial accounting. • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 75 lakhs

  26. DEVELOPMENT GOALSComponent 2: Social and Livelihoods Development 2.3 Health Care Service Delivery Improvement Plan • Improvement of existing healthcare system. • Reproductive and Child immunization Health Services • Health management information system

  27. IDENTIFIED PROJECTS2.3 Health Care Service Delivery Improvement Plan • IEC and publication of health related booklets • Health care infrastructure improvement • Convergence of all govt. programmes • Mobile health unit. TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 185 lakhs

  28. DEVELOPMENT GOALSComponent 2: Social and Livelihoods Development 2.4 Primary Education Improvement Plan • To attain 85% literacy rate in next 5 years. • Reduce dropout rate and achieve universal education • Adequate education infrastructure facility.

  29. IDENTIFIED PROJECTS2.4 Primary Education Improvement Plan • Timely procurement of furniture, TLM • Awareness campaign to check dropout, universal education • Operation of adult literacy center • Strengthening mid day meal programme • Scholarship to deserving students. TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 58.14 lakhs.

  30. DEVELOPMENT GOALSComponent 3: Municipal Institutional Strengthening Plan 3.1 Organisation Development Plan • Improving governance and ensuring active participation of the ward committee and CDS • Proper manpower planning • Skill development of the stuff • Capacity Building of the stuff and elected persons

  31. IDENTIFIED PROJECTS3.1 Organization Development Plan • Strengthening Ward Committees and CDS • Skill development and awareness building of the stuff and elected persons. • Visit to other ULBs for sharing ideas. • Introduction of performance appraisal system • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES= Rs. 21, 52, 750.

  32. DEVELOPMENT GOALSComponent 3: Municipal Institutional Strengthening Plan 3.2 Internal Processes and Systems Improvement Plan • Transition to accrual accounting system • Asset and inventory management • Generation of management system • Improving the quality of service to the citizen and infuse transparency.

  33. IDENTIFIED PROJECTS3.2 Internal Processes and Systems Improvement Plan • Implementation of e – governance • Setting up a monitoring cell • Setting up IT cell • Following best practice in water supply and conservancy. TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs.552, 92, 50.

  34. DEVELOPMENT GOALSComponent 3: Municipal Institutional Strengthening Plan 3.3 Citizens Interface Plan • Improve accountability in functioning • Grievance redress • Participation of the citizen.

  35. IDENTIFIED PROJECTS3.3 Citizens Interface Plan • Sharing information • Periodic review of citizens feedback on committed citizens charter. • Setting up information cell. TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs.27, 75, 000.

  36. DEVELOPMENT GOALSComponent 3: Municipal Institutional Strengthening Plan 3.4 Financial Plan • Enhancing property tax • Improving collection efficiency • Enhancing non tax revenue • Levy of user charges • Proper asset management • Financial control and budgeting

  37. IDENTIFIED PROJECTS3.4 Financial Plan • Various interventions for improvements in • Assessment and tax • Water charges • Advertisement tax • License fees • Expenditure management All related expenses are included in the administrative cost.

  38. FINANCIAL ALLOCATION Tied fund 3389.76 lakhs 130% of investible surplus 2091.22 lakhs Total 5480.98 lakhs Allocation of investible surplus Component 1 (75%) 1568.41 lakhs Component 2 (20%) 418.24 lakhs Component 3 (5%) 104.57 lakhs Total 2091.22 lakhs

  39. PUBLIC VALIDATION • 400 participants at the meeting • High degree of interaction • Written feedback on DDP document • Comments received were largely incorporated either later or had already been included • Those comments not included were for reasons beyond the control of the municipality

  40. CONCLUSION • Implementation of DDP will enable holistic development of Madhyagram • To undo the developmental oversights of the past • To prepare Madyamgram to take its just place in the industrial development map of West Bengal