ESS Active Cells

ESS Active Cells. Current status of the Active Cells Fire Suppression System. 14 th  ITSF hosted by European Spallation Source ERIC (ESS) in Lund, Sweden. About. Not a fire expert! Involved in/Led; New build Engineering substantiation Include fire barriers Class 2/3 SSC Piping design

ozzie
Download Presentation

ESS Active Cells

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ESS Active Cells Current status of the Active Cells Fire Suppression System • 14th ITSF hosted by European Spallation Source ERIC (ESS) in Lund, Sweden Commercial

  2. About • Not a fire expert! • Involved in/Led; • New build Engineering substantiation • Include fire barriers Class 2/3 SSC • Piping design • Fuel manufacture Commercial

  3. Overview • Active Cells • Standards • Strategy / Discussion points • Way forward Commercial

  4. EI60 Fire Boundary Compartment Volume Ceiling UKAEA/ESS. Commercial

  5. Characteristics • Industrial machinery room -> Contains milling machine etc • Storage warehouse - > Large room, high ceiling, Pits • Normally unoccupied by personnel • Occupied by machinery UKAEA/ESS. Commercial

  6. Standards • PS ISO TR 16732 Fire Risk Assessment • EN 14972-1 (DRAFT) BS EN 14972. Fixed firefighting systems. Water mist systems. Part 1. Design, installation, inspection and maintenance • BS 8489 Fixed fire protection systems – Industrial and commercial watermist systems -> non harmonised standard • prEN 12259-9 – Deluge Valves -> non harmonised standard -> cannot be used for CE marking • EN 12845 – Pumps /pump set -> non harmonised standard -> cannot be used for CE marking • ISO 6182-11 Pipe supports Commercial

  7. EN 14972-1 (DRAFT) BS EN 14972. There is a market but less developed than the sprinkler market Language not clear! BUT intent suggest a delay or inhibit is forbidden Hot cell. Waste effluent post operation. Loss of capability Hot cell. Unique character Extract: EN 14972-1 (DRAFT) BS EN 14972. Commercial

  8. BS 8489 Fixed fire protection systems (UK) Extract: BS 8489 Fixed fire protection systems. Commercial

  9. Discussion Points • Hot Cell is unique • Requires collaborative approach • Standards • Economical & proportionate to the hazard Commercial

  10. Duration Market engagement – Ongoing. Suggest scaling possible but until quote stage -> difficult to determine if market can generate a solution with minimum testing BS 8489 Fixed fire protection systems – Industrial and commercial watermist systems -> non harmonised standard Commercial

  11. Self contained or Pumped • Water mist systems connected to a public water main • Maintain inlet flow and pressure • Fault could lead to flooding • Self-contained systems • No connection to mains • Require large tanks • Susceptible to algae/organic growth Commercial

  12. Nozzles • CAP material tends to degrade in RA environments • No CAP • Justification • Maintenance – not possible wit RHS GW Sprinkler nozzle head Commercial

  13. Detection systems • Mount outside of cell • Pre-select equipment for in-cell (thermocouple?) • Fibre optic cables? -> May not be suitable?? Leave to manufacturer  Suggest technologies Reliability Maintenance Cost Commercial

  14. Typical components Commercial

  15. Duration Commercial

  16. Potential specification • Use BS8489 where possible and diverge where instructed by ESS. • Pumped system with buffer tanks • Extinguish either PC or AC – Not both at the same time • Add delay timer • Dry system • Use mains water • Stainless steel pipework & use COTS hangers Commercial

  17. Commercial

  18. Commercial

  19. Way forward • Agree approach with ESS • CDR • Procurement • Design, Manufacture, Install Commercial

More Related