Sauda Hydro Power Project. Reinsvatnet. Slettedalselva. Istjønna. Holmavatnet. Dalvatnet. Lingvang/Tengesdal. Storlivatnet. Maldal/Tengesdal. Sauda III. Sønnå. Tunnelsystem Sønnå. Dalvatnet. Skarvåna. Liabekken. Raundalen. Sønnåhamn. Raundalsbekken. Breidkvamselva. Kr. stasj.
E N D
Reinsvatnet Slettedalselva Istjønna Holmavatnet Dalvatnet Lingvang/Tengesdal Storlivatnet Maldal/Tengesdal Sauda III Sønnå
Tunnelsystem Sønnå Dalvatnet Skarvåna Liabekken Raundalen Sønnåhamn Raundalsbekken Breidkvamselva Kr. stasj. Sagelva Maldal Risvatnet Lingvang (Grunnavatnet)
Construction schedule • Length of construction period from notice to commence to water on unit 1 Sønnå H is estimated to be 2 years and 9 months. Succeeding this is a period with testing the installation, gates etc.. Unit 2 follows approx. 1 month later. • Sønnå L will be finished approx 1 month after Sønnå H unit 2. • Dalvatn power station is planned to be on line before Sønnå H and L comes on line. • The various transfere / headrace tunnels are planned to be finished as early as possible taking into consideration the limitation on transport etc.