1 / 15

Analysis of Alternatives for Accommodating Trucks on Urban Freeways in Southern Nevada

Analysis of Alternatives for Accommodating Trucks on Urban Freeways in Southern Nevada. Vinod Vasudevan, Alexander Paz, Naveen Veeramisti, Pankaj Maheswari & Majrooh James Transportation Research Center University of Nevada, Las Vegas Presentation prepared for

page
Download Presentation

Analysis of Alternatives for Accommodating Trucks on Urban Freeways in Southern Nevada

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Analysis of Alternatives for Accommodating Trucks on Urban Freeways in Southern Nevada Vinod Vasudevan, Alexander Paz, Naveen Veeramisti, Pankaj Maheswari & Majrooh James Transportation Research Center University of Nevada, Las Vegas Presentation prepared for The Monthly Advisory Committee Meeting April 08, 2010 1

  2. Las Vegas Network 2

  3. Alternatives • Truck Only Lanes • Truck Restricted Lanes • Truck Only Toll Lanes • Truck Bypass • Truckways with Toll 3

  4. System Components • Freeways, arterials, collectors, interchanges • 215 Beltway - 53 mi • I-15 - 42 mi • US-95 - 42 mi • TAZ’s - 696 (initially 1,646) • Nodes - 9129 • Links - 16582 • Control - 791 (Actual Signal timings) 4

  5. Input data • Network • Origin • Destination • Control • Demand • TDM: 547,709 for 7 – 9 AM • After Calibration: 560,448 for 7 – 9 AM • ( 2.3 % increase in demand ) 5

  6. Preliminary Calibration Results Base Case Scenario AM Peak Period

  7. One Month Progress • 9 March 2010 • 791 actual signalized intersections • actual signal timings • 49 actual counts (FAST) • Avg. Travel Time: 14.37 min (before calibration) • 26 / 49 of link counts within the 15% range (53 % within range) preliminary calibration • 8 April 2010 • 791 actual signalized intersections • actual signal timings • 62 actual counts (FAST) • Avg. Travel Time: 11.18 min (after calibration) • 52 / 62 of link counts within the 15% range (84 % within range) after Calibration

  8. 53 % of link counts are within the 15% range. FHWA requires 85% 8

  9. 84 % of link counts are within the 15% range. Acc. To FHWA Primer Vol. III, > 85% 9

  10. +15% -15% Slide 10

  11. Global Statistics • Before Calibration: • Average Travel Time – 14.3689 min • Total Network Travel Time – 129,269.9609 hrs • Average trip Distance – 8.2226 miles • Total Trip Distance(VMT) – 4,438,463.0000 miles • After Calibration • Average Travel Time – 11.1831 min • Total Network Travel Time – 105,508.7812 hrs • Average trip Distance – 7.0413 miles • Total Trip Distance(VMT) – 3,946,283.0000 miles 11

  12. Alternatives for Accomadating Trucks • Truck Restricted Lane • Truck only Lane • Truck Only Toll 12

  13. Truck Bypass

  14. Acknowledgements • RTC, Southern Nevada • Nevada DOT • USDOT - RITA

  15. Questions? Thank you!

More Related