“Uganda-UK Business Forum 6-7 May 2014”. Investment Opportunities In the Works and Transport Sector A Presentation by: Hon. Abraham Byandala  Minister of Works and Transport of Uganda 6 th -7 th May 2014. Background.

palani
Download Presentation

“Uganda-UK Business Forum 6-7 May 2014”

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. “Uganda-UK Business Forum 6-7 May 2014” Investment Opportunities In the Works and Transport Sector A Presentation by: Hon. Abraham Byandala  Minister of Works and Transport of Uganda 6th-7th May 2014

  2. Background • Africa still has a great need for basic infrastructure as connectivity between regions is lacking; • With the current efforts for East African region integration, there is a great need for regional infrastructure projects; • Access to Transport, Energy, and Water in East Africa is still inadequate; • Transport infrastructure is the least developed yet it is Vital for Economic Growth.

  3. Current Strategies • Sound planning is the key to effective implementation; • Government policy is for private sector to lead; • New technologies will deliver cost savings; • Focus on major regional/ trading corridors; • Continue management reforms that have been underway since the late 1990’s; • Provide specially focussed support to the Primary Growth Sectors of Oil and Gas, Agriculture and Tourism.

  4. Oil Sector3 Main production areas • A reliable Transport system is required to support:- • Import of Oil Production Plant and Equipment – from seaport(s); • Movement of materials for construction – from Uganda and Region; • Movement of workers; • Movement of consumables for workforce. Buliisa Kaiso/Tonya Kingfisher

  5. Agriculture Sector • Contributes 20% of GDP; • Accounts for 48% of exports; • Employs 73% of country’s population. • Investment in Transport will: • Increase productivity in productive areas; • Open up new areas for production; • Improve export competitiveness.

  6. Investment in Roads to: • Access Parks from Kampala/Entebbe • Link Parks with each other • Provide access within parks (unpaved) Tourism Sector Improved Local Access Improved ‘Circuit’ Tourist Road Projects

  7. Key Projects in the Transport Sector • Construction of the Standard Railway Gauge on regional corridor routes; • Increasing capacity of Air Transport; • Revitalisation of Lake transport (Construction of Bukasa Port); • Development of Regional Road Transport corridors and Bankable PPP Road Projects; • Development of Public Transport System.

  8. 1. Priority Rail Corridors (Northern & Central Corridors) Packwach Tororo/ Malaba Nimule Kampala Nakuru Kasese/ DRC Border Gulu Kisumu Bukasa Port Port Bell Mombasa Kabale/ Kigezi Iron Ore Mwanza Rwanda/ Burundi Tabora Legend: Northern Corridor Central Corridor Dar Es Salaam

  9. Uganda Priority Rail Projects • Kampala – Malaba Standard Gauge, 250km ($1.1 Bn) • Tororo-Packwach/Gulu-Nimule, 600km ($2.4 Bn), • Kampala-Kasese, 340km ($1.2 Bn) • Bihanga-Mirama Hills, 180km ($800m), • Pakwach-Kasese, 300km ($1.2 Bn). 2 5 1 3 4

  10. 2. Priority Air Transport Projects a) Rehabilitation of Entebbe International Airport; • New Cargo Centre; • Expansion of Passenger terminal building; • New fuel farm; • Expansion of Apron 1; • Strengthening the Runway; • Construction of domestic terminal; • Expansion of car park; • Construction of aircraft maintenance facility; • Project cost: US$ 173 million.

  11. 2. Priority Air Transport Projects b) New Airport at Kabaale (Hoima) to facilitate Oil Industry • New Runway; • New Terminal Building; • New Cargo Centre; • Project cost: US$ 200 million.

  12. 3. Priority Lake Transport Projects Development of New Kampala Port at Bukasa • Civil Works & Dredging; • Three terminals and Oil Jetty; • Cargo Handling Equipment; • Container handling equipment; • Container Yard/Container storage; • Marshal Area, Office facilities; • Parking Yard & Clearing facilities; • Railway sidings, Road and railway access; • Estimated project cost: $322 m.

  13. Priority Road PPP Projects

  14. Key Priority Road PPP Projects • Dual Carriageway (2-4 lanes each direction) ; • 95Km long Greenfield project traversing swamps and marshland; • Estimated Project Cost US$1.09 Billion; • EIRR = 26.4%, NPV=US$ 1.05 Billion; • Readiness to tender: 6 Months; • Proposed Financing Mechanism: Public Private Partnership (PPP). (i). Kampala-Jinja Expressway & Kampala Southern Bypass

  15. Dual Carriageway (2-3 lanes each direction); • Project length: 35 km; • Greenfield project traversing swamps and marshland; • Estimated Project Cost US$ 350 million; • EIRR = 19.6%, NPV=US$ 200 million; • Readiness to tender: 1 year; • Proposed financing Mechanism: Public Private Partnership (PPP). Key Priority Road PPP Projects (Cont’d) (ii). Kampala-Mpigi Expressway

  16. 4(b) Priority Road Corridor Projects • Northern Corridor (Kampala-Malaba); • Gulu-Kisangani (Goli); • Gulu to Nairobi (Tororo/Malaba); • Gulu to Juba (Nimule); • Gulu to Mbarara; • Northern Eastern Corridor (Tororo-Kamdini). Kampala and Guluwill become regional hubs as a result

  17. (i). Kampala-Nairobi via Malaba Corridor • 10 year Design-Build-Maintain-Operate-Transfer (Asset Management) Contract; • Upgrading sections of road to dual carriageway; • Rehabilitation and upgrading of sections of the road corridor; • Routine and periodic maintenance of the whole corridor; • Road safety and traffic management and axle overload control; • Project length: 221km (Uganda section only); • Estimated Project Cost US$ 740 million; • Readiness to tender: 1 year.

  18. Conventional Design-Bid-Build contracts for corridor sections; • Upgrading to Class I paved roads; • Rehabilitation and upgrading of sections of the road corridor; • Routine and periodic maintenance of the whole corridor; • Road safety and traffic management and vehicle load control; • Project length: 185 km (Uganda section only); • Estimated Project Cost US$ 140 million; • Readiness to tender: 1 year. (ii). Gulu-Kisangani via Goli Corridor

  19. (iii). Tororo/Malaba-Juba via Gulu Corridor • 10 year Design – Build – Maintain – Operate – Transfer (Asset Management ) Contract; • Rehabilitation and upgrading of sections of the road corridor; • Routine and periodic maintenance of the whole corridor; • Road safety, traffic management & vehicle load control; • Project length: 340 km; Estimated Project Cost US$ 300m; • Project preparation supported by the World Bank; • General Procurement Notice (GPN) advertised in April 2014; • Request for Expression of Interest for Supervision services to be advertised by June 2014. - Tororo-Kamdini Section (340km)

  20. (i) Bus Rapid Transit (BRT) 5. Priority Public Transport Projects Main characteristics • Infrastructure Capital - $220m • Buses - $55m; • Total Cost – $275m; • High-frequent mass transport with Large buses, Separate bus lanes; • High speed, Safe & High quality • Affordable, & Cost-effective; • High capacity vehicles: 18m long articulated buses, with a capacity 150 passengers (60 seated + 90 standing); • High frequencies: up to 10 vehicles per hour (one way).

  21. 5. Priority Public Transport Projects (Cont’d) • Links from Mukono Railway Station to Bujuuko Railway Station via Kampala (City Centre) Railway Station (54km) and Port Bell to Kampala (City Centre) Railway Station (8km); • Project length: 62km; • Estimated Project Cost US$ 69 million; • Financing mechanism: Private investment in rolling stock and operations. Public investment in infrastructure; • Readiness to tender: 2 years. Project Details • Upgrading of railway infrastructure; • Procurement of rolling stock for passenger rail services; (ii) Urban Rail Project

  22. Conclusions • Investment and business opportunities are available in the works and transport sector as highlighted; • There is predictable investment environment; • Fully liberalised economy, good market access; • Enabling legislation such as PPP Policy has been approved by Cabinet and will soon be approved by Parliament; • There is strong natural resource base; and • Government will support the private sector.