ARA Weekly Status (May 25 -May 31) Jiwoo Nam

ARA Weekly Status (May 25 -May 31) Jiwoo Nam. NTU-UW Production Meeting ( ARA Weekly meeting, May 30 ) H- Pol Antenna Issue Performance of new Ferrite for shown ( Spectrum Magnetics) UW Proposal 12 H- Pol with Spectrum Magnetics for ARA-3 (10 @ NTU, 2 @ UW in July)

palila
Download Presentation

ARA Weekly Status (May 25 -May 31) Jiwoo Nam

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ARA Weekly Status (May 25-May 31)Jiwoo Nam • NTU-UW Production Meeting (ARA Weekly meeting, May 30) H-Pol Antenna Issue Performance of new Ferrite for shown (Spectrum Magnetics) UW Proposal 12 H-Pol with Spectrum Magnetics for ARA-3 (10 @ NTU, 2 @ UW in July) 12 V-Pol with FerriShield for ARA-2 (10 @ NTU, 2 @ UW in July) NTU Proposal? More development of ARA-2 H-pol  Ferrite lead time / ordering timing is an issue • Surface Team Prototype DAQ Box in progress  Some minor drawing mistakes found  All connectors/Cables/ Fasteners should be double-checked Patrick has sent new PCB design of ATRI board (looks OK) Some delays in ordering of electric parts for electric board production. Electric Board Production Plan PCB Production + Soldering in June and Early July  Checked by Patrick in July  Final Assembly in Aug Can we speed up more?

  2. ARA Weekly Status (May 25-May 31)Jiwoo Nam • Down Hole Team Li-Che joined in the Downhole team Fast action needed for New NTU H-pole Antenna Design + Test Will be nice to show the first LNA Box performance results in the ARA weekly meeting • General Direction next week All designs will be fixed in this week Production should be started immediately - PCBs - LNAs - V-pole Antennas Please provide each team’s production plan for June

  3. Weekly Cleaning Person (KLC , Keep Lab Clean) Trash / One Time Vacuum / Mop June Week 1 Week 2 Week 3 Week 4 Aug Week 1 Week 2 Week 3 Week 4 Week 5 July Week 1 Week 2 Week 3 Week 4