1 / 21

AHCAL Mechanics and test beam setups

AHCAL Mechanics and test beam setups. status report. Karsten Gadow AHCAL Main Meeting DESY, 09.12.2013. Outline AHCAL Status Report Mechanics and test beam setups. DESY II test beam setup PS/SPS AHCAL test beam setup PS/SPS AHCAL Tungsten test beam setup AHCAL cabling and cooling setup

Download Presentation

AHCAL Mechanics and test beam setups

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AHCALMechanics and test beam setups status report Karsten Gadow AHCAL Main Meeting DESY, 09.12.2013

  2. Outline AHCAL Status ReportMechanics and test beam setups • DESY II test beam setup • PS/SPS AHCAL test beam setup • PS/SPS AHCAL Tungsten test beam setup • AHCAL cabling and cooling setup • AHCAL absorber structure modification (earth quake)

  3. AHCAL Status ReportMechanics and test beam setups • DESY II test beam setup • PS/SPS AHCAL test beam setup • PS/SPS AHCAL Tungsten test beam setup • AHCAL cabling and cooling setup • AHCAL absorber structure modification (earth quake)

  4. AHCAL DESY II test beam setup 15 pieces 1xHBU housings are produced at DESY all 15 layers will be tested with air stack 15 HBU´s with CIB´s has to be mounted and commissioned

  5. AHCAL DESY II test beam setup DESYII TB22 1 t Stage Air Stack Absorber stack with 5 layers

  6. AHCAL DESY II test beam setup Task list (Summary): • Test beam setup • position inside the TB 22 allows parasitic measurements up to KW10 2014 • test beam schedule fixed KW1+2 2014 • supply and read out hardware ongoing • 15 layer absorber structure installed • 1 t DESY II Stage installed • 15 layer air stack ready • Detector layer production • production of 15 pieces 1xHBU housings ready • production of 15 HBU´s and install tiles 6 done • commission and beam test in air ongoing

  7. AHCAL Status ReportMechanics and test beam setups • DESY II test beam setup • PS/SPS AHCAL test beam setup • PS/SPS AHCAL Tungsten test beam setup • AHCAL cabling and cooling setup • AHCAL absorber structure modification (earth quake)

  8. AHCALPS/SPS AHCAL test beam setup Movable Stage with 2 x absorber stack Tungsten setup layers 2 x absorber stack stand alone Air stack Movable stage with 1 x absorber stack

  9. AHCALPS/SPS AHCAL test beam setup Task list (Summary): • Test beam setup • position inside PS/SPS ? • test beam schedule ? • supply, read out and cooling scheme ongoing • install absorber structure self standing or with Movable Stage ? • install new GUI for Movable Stage control ongoing • Detector layer production • production of 2 x 50 x 2xHBU-extended housings (MPI) ongoing • production of 2 x 48 x 2 HBU´s and install tiles ? • production of 10 x HBU dummy's ? • commission and test ?

  10. AHCAL Status ReportMechanics and test beam setups • DESY II test beam setup • PS/SPS AHCAL test beam setup • PS/SPS AHCAL Tungsten test beam setup • AHCAL cabling and cooling setup • AHCAL absorber structure modification (earth quake)

  11. AHCALPS/SPS AHCAL Tungsten test beam setup Al frame parts produced at MPI tungsten area aluminum frame with 2 x 1 mm FR4 cover to center the housing

  12. AHCALPS/SPS AHCAL Tungsten test beam setup housing with SIB SIB housing with CIB CIB production of 0,5 mm thin stainless steel housings by MPI

  13. AHCALPS/SPS AHCAL Tungsten test beam setup special configuration with extender board 4 HBU´s per layer

  14. AHCALPS/SPS AHCAL Tungsten test beam setup closed housings 50 frames removed cover plate frame with housings

  15. AHCALPS/SPS AHCAL Tungsten test beam setup 40 tungsten absorber plates are installed add 8 tungsten absorber plates ? Install Tail catcher ? Tail Catcher Instrumentation?

  16. AHCALPS/SPS AHCAL Tungsten test beam setup Modification of the tungsten absorber structure ?

  17. AHCALPS/SPS AHCAL Tungsten test beam setup Task list (Summary): • Test beam setup • configuration 48 layers? • test beam schedule ? • supply, read out and cooling preparation ongoing • modify tungsten absorber structure ? • Tail Catcher installation ? • Detector layer production • production of 50 frame parts (MPI) and mounting with facing (DESY) ready • production of 2 x 50 x 2xHBU-extended housings (MPI) ongoing • production of 2 x 48 x 2 HBU´s and install tiles ? • commission and test ?

  18. AHCAL Status ReportMechanics and test beam setups • DESY II test beam setup • PS/SPS AHCAL test beam setup • PS/SPS AHCAL Tungsten test beam setup • AHCAL cabling and cooling setup • AHCAL absorber structure modification (earth quake)

  19. AHCAL cabling and cooling setup power distribution LDA Power cabling for 1 x submodul

  20. AHCAL Status ReportMechanics and test beam setups • DESY II test beam setup • PS/SPS AHCAL test beam setup • PS/SPS AHCAL Tungsten test beam setup • AHCAL cabling and cooling setup • AHCAL absorber structure modification (earth quake)

  21. AHCALabsorber structure modification (earth quake) ILD workshop, Cracow, 24-26 September 2013 Simulation for AHCAL barrel and end cap structure must be done soon!

More Related