300 likes | 392 Views
31 Jan 00 Contingency Response Force Brief. CRF BRIEFING. MISSION SPECIFICS CONVOY STAGING COMMUNICATION PROCEDURES ON-SCENE SITREPS SEQUENCE OF EVENTS NORMAL LANDING CONTINGENCY / MODE LANDING. ELS/LAS RESPONSIBILITIES. FACILITY COMMANDER PROVIDE SUPPORT DETAILED IN FUNCPLAN 3610-99
E N D
CRF BRIEFING • MISSION SPECIFICS • CONVOY STAGING • COMMUNICATION PROCEDURES • ON-SCENE • SITREPS • SEQUENCE OF EVENTS • NORMAL LANDING • CONTINGENCY / MODE LANDING
ELS/LASRESPONSIBILITIES • FACILITY COMMANDER • PROVIDE SUPPORT DETAILED IN FUNCPLAN 3610-99 • DESIGNATE ASCO • ON-SCENE COMMANDER • ENSURE CRF READINESS • SUPERVISE CRF ACTIONS • PROVIDE TIMELY SITREPS • FIRE CHIEF • PROVIDE STANDARD CRASH COVERAGE • SUPERVISE CREW RESCUE
LAUNCH DAY ACTIVITIES • L-3:00 - LAUNCH TEAM ON CONSOLE IN SOC • L-1:30 - LAUNCH ABORT SITES CALL IN ON DDMS PHONE BRIDGE • RECEIVE LATEST STATUS OF LAUNCH COUNT • CONDUCT BRIEFING (1615 NASOC muster – OSC, CDO, MED, BIO, SEC, FIRE, ODO, ATC, MASS CAS / WX) • L-0:15 - SITES CALL INTO DDMS PHONE BRIDGE • ASCO MAINTAINS LOOP UNTIL CLEARED OFF • (1730 POC roll call on ramp FM/Crash FM) • L-0:00 - RUNWAY DEDICATED • L+0:10 - CRF RELEASED (when notified by ASCO)
Pre-Staging (go abort) FIRE CH OSC ODO AMB SEC DECON STAIRS BUS
+BIO FIRE CH / OSC ODO AMB SEC DECON STAIRS BUS Rwy 29 Staging
+BIO FIRE CH / OSC ODO AMB SEC DECON STAIRS BUS Rwy 02 Staging
+BIO FIRE CH / OSC ODO AMB SEC DECON STAIRS BUS Rwy 11 Staging
+BIO FIRE CH / OSC ODO AMB SEC DECON STAIRS BUS Rwy 20 Staging
R-1 R-2 AMB AMB DECON STAIRS CONVOY STAGING 09 27 C/F/R CH-2 C/F/R C/F/R / BIO CH-1 / OSC SP BUS
TOXIC CORRIDOR • COMPUTED USING A KNOWN CONDITION OR A NITROGEN TETROXIDE SPILL OF 80 LB/MIN, OVER 8 MIN, IN 800 SQ FT SPILL AREA {NASOC & Weather will run this upon notification of KEF abort} DATE: 11-20-95 TIME: 1430 GMT CONTINUOUS RELEASE MONOMETHYL HYDRAZINE (MMH) SHORT TERM EXPOSURE LIMIT .48 PPM TIME WEIGHTED AVERAGE .03 PPM TEMP 74F, WIND 290/10 LIQUID RELEASE EMISSION RATE 16 LB/MIN SPILL AREA 320 SQ FT EVAPORATION RATE 5.8 LB/MIN MAX CONCENTRATION W/IN 30 M CONCENTRATION AT 30M = 53 PPM 90% PROBABILITY HAZARD DISTANCE = 2256FT HAZARD DIRECTION AND WIDTH = 110 DEG + 34 DEG MAX DISTANCE FOR 1 PPM = 1074 FT MAX DISTANCE FOR 3 PPM = 644 FT MAX DISTANCE FOR 5 PPM = 539 FT
HAZARD ASSESSMENT TEAM PREPARATION • ENSURE PERSONAL PROTECTIVE EQUIPMENT AND MONITORING DEVICES ARE READY • KNOWN LANDING TIME • DOUBLE SONIC BOOM • DON’T WAIT UNTIL THE ORBITER LANDS TO SUIT UP • BE READY TO APPROACH THE ORBITER ON THE OSC’S COMMAND (COMMs !!!)
OSC INITIAL SIZE-UP • USE BINOCULARS • FACTORS TO CONSIDER: • AMOUNTS OF TOXIC FUELS ONBOARD • POOLING LIQUID • FIRE / SMOKE • VAPORS • WINDS / WEATHER CONDITIONS
AFTER COMMWITH ORBITER CREW • NOMINAL • NORMAL LANDING OPERATIONS • OSC PROVIDES ORBITER CREW SUPPORT • CONTINGENCY • EMERGENCY CONDITION • OSC DIRECTS RESCUE OPERATIONS
OSC “ROGER” (HEADLIGHTS) NOMINALVISUAL SIGNALS IF OSC CAN’T TALK (UHF 259.7/282.8/243.0) #1 CREW OKAY #2 RCS/OMS/SIDE HATCH SAFE #3 APU SHUTDOWN
EMERGENCYVISUAL SIGNALS FLASHLIGHT FROM CREW NEED ASSISTANCE WILL NOT JETTISON HATCH NEED ASSISTANCE WILL JETTISON HATCH HEADLIGHTS FROM OSC = EMER CREW EGRESS
C/F/R STAIR RESCUE BUS SP C/F/R OSC / CH-1 AMB AMB C/F/R HAZARD ASSESSMENT 9 1250 FEET 200 FEET 6 oclock position 12 BIO DECON HOT ZONE COLD ZONE WARM ZONE WIND 3
HAZARD ASSESSMENT • OSC CONFIRM OMS, RCS, AND SIDE HATCH SAFED • PROCEED NO CLOSER THAN 200’ • CONDUCT FORWARD ASSESSMENT • HATCH AREA • FORWARD RCS THRUSTERS • VENT DOORS • CHOCK NOSE • NOTIFY OSC OF DOWNGRADE • CONTINUE AFT ASSESSMENT FORWARD AFT BIO TEAM 200 FEET
C/F/R STAIR BUS RESCUE OSC / CH-1 C/F/R AMB AMB C/F/R PARTIAL DOWNGRADE 1250 FEET SP 200 FEET 700 FEET BIO DECON COLD ZONE WARM ZONE HOT ZONE WIND
C/F/R RESCUE STAIR OSC / CH-1 BIO BUS C/F/R AMB AMB C/F/R FULL DOWNGRADE 1250 FEET SP 200 FEET 700 FEET Ground stairs to Orbiter nose Points E-1 / E-2 DECON COLD ZONE WARM ZONE HOT ZONE WIND
NOMINAL RESPONSE SUMMARY • COMMUNICATIONS • HAZARD ASSESSMENT • PARTIAL / FULL DOWNGRADE • NOMINAL ACTIONS
CONTINGENCIES MODE = EMERGENCY SITUATION • MODE I-IV - LAUNCH PAD EMERGENCIES • MODE V - UNAIDED EGRESS / AIDED ESCAPE • MODE VI - AIDED EGRESS / AIDED ESCAPE • MODE VII - OFF RWY LANDING-INACCESSIBLE • MODE VIII - BAILOUT
MODE V UNAIDED EGRESS / AIDED ESCAPE • DECLARED BY THE FLT DIR, CREW OR OSC • C/F/R PROCEED TO 200’ OR AS REQUIRED • REMAINING CONVOY ELEMENT STAY @ 1250’ • CREW EGRESS • C/F/R TRANSPORTS CREW TO DECON / MEDICAL
MODE VI AIDED EGRESS / AIDED ESCAPE • DECLARED BY THE FLT DIR, CREW OR OSC • FOR OSC - LOST COMM INCLUDING VISUAL • C/F/R PROCEED TO 200’ OR AS REQUIRED • RESCUE PERSONNEL INGRESS ORBITER • IAW PROCEDURES DOCUMENT • CREW EGRESS • C/F/R TRANSPORTS CREW TO DECON / MEDICAL
C/F/R STAIR SP BUS RESCUE BIO OSC / CH-1 C/F/R AMB AMB MODE V / VICONVOY POSITION 1250 FEET AS REQ’D CORRIDOR DECON C/F/R COLD ZONE WARM ZONE HOT ZONE WIND
C/F/R RESCUE SP STAIR OSC / CH-1 BUS C/F/R AMB AMB C/F/R CONVOY JUST PRIOR TO MODE (WORST CASE) 1250 FEET BIO DECON COLD ZONE WARM ZONE HOT ZONE WIND
EGRESS CONDITIONRED • CATASTROPHIC CONDITION POSING SERIOUS THREAT TO RESPONSE FORCE • EXPLOSIVE, TOXIC • DECLARED BY: OSC, FIRE CHIEF • BROADCAST CONDITION • RADIOS, SIRENS, LIGHTS • EVACUATE ALL PERSONNEL BEYOND 1250’ • LEAVE ASTRONAUTS IF NOT READY FOR IMMEDIATE EVACUATION
E M E R G E N C Y 1. MODE DECLARED 1 2 5 0 FT RESPONSE SUMMARY CONTINGENCY R E S P O N S E N O M I N A L R E S P O N S E 1. ORBITER LANDS 2. OSC DIRECTS HAZARD ASSESSMENT 3. PARTIAL DOWNGRADE, OSC & C/F/R MOVE IN 4. FULL DOWNGRADE, STAIRS MOVED IN, ASTRONAUTS EGRESS AND TRANSPORTED 5. ASTRONAUTS DECON’ED, TRIAGED, AS NECESSARY 2. C/F/R RESPOND, ALL OTHERS EVACUATE TO 1250’ 3. ASTRONAUTS EGRESS -OR- C/F/R AIDS EGRESS 4. ASTRONAUTS AIDED IN ESCAPE FROM AREA 5. ASTRONAUTS DECON’ED, TRIAGED, AS NECESSARY
11 Day Mission Posture • May have only 1 hour notice prior to Orbiter landing • Upon notification by Kennedy Space Center, IDF will contact Tower (x7701) to activate the crash phone net • NASOC / OSC will ensure CDO, ODO, Bus and Stairs are recalled • All Orbiter Convoy teams form at ESSO with ODO/OSC • Same game plan is executed that we would use today