An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. P09713 – FRESH BREAD AND ROLL SCALING ROOM Senior Design Winter 2008-2009

  2. Team Introduction • Erik Webster, Industrial Engineer – Project Manager • Kate Gleason, Industrial Engineer – Technical Lead • Cecilia Enestrom, Industrial Engineer – Technical Lead • Andrew Tsai, Mechanical Engineer • Grant Garbach, Mechanical Engineer

  3. Project Overview • Sponsored by Wegmans • Bakery Facility on Brooks Ave, Rochester New York • Process for scaling and mixing of dry ingredients for commercial bread and roll production • Three major project aspects: • Lean Process Improvements • Improved Layout Design for Inventory Management • Improved Ergonomics and Product Quality • Design of procedures and equipment for sifting and screening dry ingredients prior to mixing into the dough for the commercial bread and roll production line.

  4. Status of Week 1 Deliverables • Customer Needs Assessment • Project Plan Elements • 1-page project summary • Work Breakdown Structure • 2-quarter schedule and milestones • Team Values and Norms

  5. Key Challenges • Working around busy schedules • Customer availability is limited • Wegmans engineering resources are very limited • Justifying capital investments to Wegmans • Working with an existing production system that will be in continuous operation throughout the design and implementation phases of the project