1 / 3

Way Forward on CA_Band 42C

3GPP TSG-RAN WG4 Meeting #7 1 Seoul , Korea, 19 – 23 May, 2014. R4- xxxxx. Way Forward on CA_Band 42C. Background. B42/B43 UE co-existence requirement of -50dBm/MHz need to be resolved as a legacy issue since -50dBm is thought not feasible for implementation.

pascha
Download Presentation

Way Forward on CA_Band 42C

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 3GPP TSG-RAN WG4 Meeting #71 Seoul, Korea,19–23May,2014 R4-xxxxx Way Forward on CA_Band 42C

  2. Background • B42/B43 UE co-existence requirement of -50dBm/MHz need to be resolved as a legacy issue since -50dBm is thought not feasible for implementation. There have been discussions on this issue for almost a year, however no progress has been made. • There is very clear market demand for CA in Band 42 in some countries that don’t have Band 43. The WI CA_Band 42C completion in a timely manner needs to be considered in order not to be delayed by a legacy issue not specific to this WI!

  3. Way Forward • Technically endorse the CRs for 2DL+2UL _Band 42C without Band 42/43 co-existence in RAN4#71 and keep the WI open until RAN4#72. • Replace -50dBm/MHz with reasonable UE co-existence requirement target on completing related evaluations in RAN4#72; • If the evaluations for Band 42/43 co-existence can be completed in RAN4#72, the CA_Band 42C CRs agreed in RAN4#71 shall be update to capture the relevant requirements for Band 42/43 co-existence. • If the evaluations for Band 42/43 co-existence cannot be completed in RAN4#72, the CA_Band 42C CRs agreed in RAN4#71 shall be presented to RAN#65 and the WI CA_Band 42C will be closed.

More Related