An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Technical Equipment foragriculturalanaerobicdigesters in Europe Camilo Andrés Wilches Tamayo Biogas weserems GmbH & Co KG

  2. Table of contents • Company´s Presentation • Possible Biogas Power Plant configurations • Renewable raw materials • Biowaste • Technical equipment • Feeding system • Pumping system • Heating system • Agitators • Gas storage in the digester • Pasteurization

  3. The company biogas weser ems GmbH & Co .KG is a company with over 10 years experience specializing in design, planning and construction of biogas power plants • More than 150 installed biogas plants • Installed capacity >98 MWel • Energy parks 8,5MWel • International Projects

  4. Possible configurations of the biogas plant • Renewable raw materials. • Majority of German plants (EEG 2004) • Independence of the farmer • Price 19 cent/kWh Germany • 13.5 cent/kWh Spain • 28 cent/kWh Italy • Special Equipment • Solid feeder • Pumps • Agitators Renewable raw materials. „NaWaRo“

  5. Possible configurations of the biogas plant • Biowaste • This region has an intensive food and livestock production • Waste market • Price 9 cent/kWh Germany • 13.5 cent/kWh Spain • 22 cent/kWh Italy • Special Equipment • Pasteuritzation unit • 2 Pumps are required • Double walled digester with leakage detection Biowaste

  6. Technical equipment Biogas Feeding system Heating system Digestates Storage Pumps CHP Biogas Biogas Digester 2 Digester 1

  7. Technical equipment Feeding system

  8. Technical equipment Feeding system Depends of the substrate • Dry matter < 12% pumped from tanks to the digesters • Dry matter > 25% solid feeder and augers to the digesters Configurations: Walking floor : corn, cereals (size 20-120 m³) Mixer feeder: straw (size 8 -80m3) manure + straw paste materials (powder) liquid producing materials

  9. Technical equipment Feeding system Pumps

  10. Technical equipment Pumping system In general a susbtrate is pumpable when: Dry matter <12 %, homogeneos, particle size < 12mm Pumping system: Any possible substrate movement is allowed

  11. Technical equipment Pumps Most of the pumps used are Positive Displacement Pumps Pumps type: • Rotary lobe pump: price high wear (more maintenance) + size - easy maintenance suction capacity < 0,9 bar • Progresive cavity pump: less maintenance time demanding maintenance + high pressure (25 bar) - suction capacity < 0,9 bar 500 kW power plant 11 kW, 50 m3/h

  12. Technical equipment Pumps • Long distance between substrate storage tank and pump station ? • Centrifugal pump • directly in the tank • Normally used for manure • DM= 8% 11 kW 90 m3/h.

  13. Questions? (Break 5 min)

  14. Technical equipment Feeding system Heating system Pumps CHP

  15. Technical equipment Heating system • Heat requirements (625 kW biowaste): • Heat up substrate (8°C to 40°) = 38,64 kWth • Maintain temperature digesters = 170 kWth • (outside temperature -12°C) • Pasteurizer 70°C 1 hour = 80 kWth • External user (green house, industry,,,) P el A B P th Exhaust gas P th hot water P th losses T= 40° T= 35° • Energy Flow gas motor 625 kWel Intercooler 1st stage Lube oil Engine Exhaust gas A B Intercooler 2st stage

  16. Technical equipment Heating system

  17. Technical equipment Agitators Feeding system Heating system Digestates Storage Pumps CHP Digester 2 Digester 1

  18. Technical equipment Agitators • Submersible Agitators: Used in all installations • Possibility to change - height - orientation • 17kW -> agitate 1000 m3 • 10 min every hour • always during digester feeding • Dry substrate Agitators Used for dry substrates • straw, mais, cereals, offal flour • Low density of the substrates • < 1 g / cm3 • Destroy acumulations of solids. • 15kW similar capacities

  19. Technical equipment Gas storage membrane Biogas Feeding system Heating system Digestates Storage Pumps CHP Biogas Biogas Digester 2 Digester 1

  20. Digester´s section Technical equipment Gas storage membrane

  21. Technical equipment Pasteurization Biogas Feeding system Heating system Digestates Storage Pumps CHP Pasteurization Biogas Biogas Digester 2 Digester 1

  22. Technical equipment Pasteurization • Heat treatment (EU 1774) • avoid risk of dispersal of patogens from any animal subproduct • 70°C, 1h • Pumpable material • Two pumps are required • Tanks with heating and mixing system. • When sizing consider heating time (4 h) • Pasteurized material should not be put directly in to digester