Summary from the Secondary Beam working group meeting ( link ) CENF meeting 6 th June 2013. M. Calviani for the SBWG. Integration. S . Girod. S . Girod. Transport items. Detailed assessment of requirements with HE ongoing 40 ton crane Redundant , but at which level?

patia
Download Presentation

Summary from the Secondary Beam working group meeting ( link ) CENF meeting 6 th June 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Summary from the Secondary Beam working group meeting (link)CENF meeting 6th June 2013 M. Calviani for the SBWG

  2. Integration S. Girod M. Calviani - CENF PTM

  3. S. Girod M. Calviani - CENF PTM

  4. Transport items • Detailed assessment of requirements with HE ongoing • 40 ton crane • Redundant, but at which level? • Issue when hot object are removed form the trench to move into the morgue • Ideas of modify the support structure (*) to allow for a “flask/bell”-like configuration • factor of ~50x attenuation with 4 cm Pb + 2 cm Fe (1 Sv/h  20 mSv/h) • … but ~25 ton shielding • 5 ton crane for “small” manipulation • Possible need for a “crane” to move material inside the cooling station rooms (manual?) • ~2 ton (CV input!) M. Calviani - CENF PTM

  5. “Croquis” N. Baddams/K. Kershaw M. Calviani - CENF PTM

  6. CE drawings b.755 • Ongoing modifications: • Modification for access to the service galleries • Personnel access • Control room and proximity EL equipment space reservation (Jura-side) CATIA MODEL ST0517376_01 L. Faisandel M. Calviani - CENF PTM

  7. “Croquis” N. Baddams M. Calviani - CENF PTM

  8. Target brainstorming • Target design/brainstorming ongoing to try to solve the issue of target bending • Design with a max acceptable sagitta of 1 mm, with 3 mm clearance between external target container and inner conductor • One idea is to have Be stiffeners to sustain the weight of the graphite • max thickness of the Ti-body shall be ~0.5 mm M. Calviani - CENF PTM

  9. VSC sector valves principle • First ideas with TE/VSC for the sectorization of the primary line • Further discussions needed for the primary/secondary beam interface G. Vandoni M. Calviani - CENF PTM

  10. M. Calviani - CENF PTM

  11. RP: primary/secondary beam interface C. Strabel, Hei. Vincke M. Calviani - CENF PTM

  12. C. Strabel, Hei. Vincke M. Calviani - CENF PTM

  13. M. Calviani - CENF PTM

  14. RP: air activation M. Calviani - CENF PTM

  15. Comments • Reduction of upstream shielding will be considered • 1.6 m pure Fe • Investigate the possibility to reduce the aperture • Depends on the design of the primary beam line and the effect of losing an MB • Installation of a passive “mask” should be considered • DGS/SEE will perform a thorough analysis of the ventilation/extraction requirements with the RP input • He-vessel flush every shutdown  3H release • Ventilation requirements underground area M. Calviani - CENF PTM

  16. Follow-up • EN/CV = requirements, loads, space, accessibility, etc. • EN/EL = configuration/requirements as soon as loads are ready • Max 50 m between switchgear and HV transformer • DGS/RP/RW = possible reuse of CERN waste • GS/ASE = first discussions on access system requirements • TE/VSC (TBC) = primary/secondary beam interface and He pumping • PH/DT (TBC) = Horn/reflector electrical configuration CNGS experience M. Calviani - CENF PTM