1 / 6

MMAC T71 Ad hoc WG Liaison Report

Overview of the MMAC organization and its activities, specifically the T71 Ad Hoc Working Group's revision of the current ARIB STD-T71 to incorporate technical requirements for 5GHz Band Wireless Access systems.

Download Presentation

MMAC T71 Ad hoc WG Liaison Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MMAC T71 Ad hoc WGLiaison Report Yasuhiko Inoue, NTT Y.Inoue, NTT

  2. MMAC Overview • MMAC (Multimedia Mobile Access Communication Systems Promotion Council) • An organization in the ARIB (Association of Radio Industries and Businesses). • Activities: • Investigation and study on system specifications • Demonstrative experiment • Information exchange and popularization activities, etc • Working Groups • High Speed Wireless Access • 5GHz Mobile Access (Wireless Access and Wireless LAN) • Wireless Home-Link (Wireless 1394) http://www.arib.or.jp/mmac/e/ Y.Inoue, NTT

  3. T71 Ad hoc Working Group • ARIB STD-T71 • Technical requirements and specifications for IEEE 802.11a systems to operate in Japan. • T71 Ad hoc WG has been created to revise the current ARIB STD-T71 to incorporate the technical requirements for 5GHz Band Wireless Access systems. • Chair: Mr. Noboru Matsumoto, SpeedNet • Member companies: Atheros, Canon, Denso, Fujitsu, Hitach Cable, Intel, Japan Telecom, JRC, Mitsubishi, Murata, NEC, NTT, TOYOCOM, Panasonic, Samsung, SpeedNet, TDK, Toshiba, TTNet, and more • Supposed to finish its work by the end of March Y.Inoue, NTT

  4. Activities • T71 Ad hoc WG had two meetings • Jan. 23: The 1st meeting • The drafting group was created. • The drafting group started to review current ARIB STD-T71 to find the sections to be modified. • Feb. 25: The 2nd meeting • The initial version of the draft was presented to the WG members. • Discussions: • Clarification for some texts (e.g. spurious emissions) • Channel numbering scheme, etc Y.Inoue, NTT

  5. What’s in the draft? • Technical Requirement • Frequency Plan & Channelization • Radio Equipment Ordinance Article 49-21: (5GHz Band Wireless Access Systems) • 20MHz/channel, 10MHz/channel, 5MHz/channel • Transmit power, Spectrum mask, Spurious emission, etc • Open Issue • Channel Numbering Method • Currently, we have 1 proposal. But not adopted in the draft. • T71 Ad hoc strongly hope to have the same mechanism with TGj. • Chair of T71 Ad hoc sent an e-mail to ask for review of TGj draft. Y.Inoue, NTT

  6. Schedule • Mar./19/: The 3rd (and final) meeting of the T71 Ad hoc WG. • The draft will be approved by the WG. Discussions by email if necessary. • Apr./25(?): The draft must be fixed. • May/(??): ARIB Standards Assembly. • The draft will be approved as ARIB STD-T71 ver.2. Ad hoc WG will be created again for further revisions Y.Inoue, NTT

More Related