180 likes | 190 Views
This document provides the current status of the ASTRO-G project, including budget requests, project team formation, and ongoing developments. It also discusses the status of the ASTRO-G GPS receiver and LNA developments.
E N D
ASTRO-G current status • Budget Request to the government. (July, 2007) • Approved as a new project. (not a full) • Project team formation • Project Manager: Hirobumi SAITO + ~20 engineering staffs • Edwards Akihiro DOI (April~) • Hirabayashi Masato TSUBOI (April~) • NAOJ: Kameno is now in Kagoshima-U. Hagiwara (Nov.~) • New Post-Doc in JAXA and NAOJ • Contractor Selection. • Bus system, Main Antenna, Coolers • On going : Thrusters, Low Noise Receivers • I/F control document (ICD) preparation. (March-May, 2007) • Preparation of stating the project from April, 2007 • System Definition Review (March, 2007) • Review for Project Starting. (March, 2007)
VSOP-2 System Block Diagram ObservingSystem Telemetry handling/heater control system Telecommunication/ Command System Attitude and orbit Control system Power supply system
ASTRO-G GPSR status • 3 candidates • JPL GPS receiver. • Blackjack : ~ IGOR, Blackjack • New development for including Galileo IDC (I/F control Document) -> Need JAXA/JPL contract • BRE • IGOR ~ Blackjack: 4 RF ch, 48 tracking ch., L1, L2, GPS only • Pyxis: 4 RF ch. 96 tracking ch, L1, L2, L5, GPS/Galileo • Domestic JAXA/NEC-Toshiba Space GPSR • 2 Ch RF, 8 ch, L1, L2, GPS only • Need do decide weather we need Galileo or not ? (Feb. 2007) • Need ICD for ASTRO-G soon (April 2007) • Budget source ? JPL ? / ISAS (JAXA)
ASTRO-G LNA status • Accelerometer : Decided not to use for ASTRO-G • Study of SLR possibility. • candidates • Domestic Development • EUDYNA(Former Fujitsu) Device (Baseline) • Discrete HEMT for 8 GHz. • MMIC HEMT (InGaP/InGaAs p-HEMT) development (22, 43 GHz) • InP development (other budget) • NRAO RX • European RX • Need to discuss cost, schedule, ICD for possible laboratory. • Need ICD for ASTRO-G soon (April 2007??) • Budget source ? ISAS (JAXA)/ JPL or ESA/EC …
Design of the frontend • LNA • MMIC HEMT LNAs • Wide band, low loss feed and polarizer studies • Cryogenic studies • Space-qualified cryogenic coolers ASTRO-E2 (Xray) ASTRO-F(Infrared) PLANET-C(Vinus) SMILES (Earth Obs.)
Current status of Front-end Developments • 22/43 GHz Cooled Receiver • MMIC Device • High Quality & Reliability GaAs MMIC HEMT device • Low Power Consumption • Microwave components • Low Thermal Conductivity WG • Circular Polarizer • Horn • Possibility of design without isolator • Thermal Shield at horn window • Layout components 110 K 30K 2 coolers ? ASTRO-F type
ASTRO-G Development schedule Concept Design Basic Design Detailed D. Manufacture and Test Operation WG phase Pre-Project PM FM Design FM Manu I/F test Unit test Final Test FOp Operation Phase -E Pre Phase -A Phase -A Phase -B Phase -C Phase -D Launch △ Project starts △ Review △ Review △ Review △ Review More than 5 years operation △ △ △ △ △ △Budget Request Selection of the science mission in ISAS △System I/F Fixed Approval of project preparation Design of PFM Structure Antenna, Obs.system Attidute control system NEXT (X) Solarsail (Jupiter) △Selection of contractors Ground Tracking Stations Developments Op. Test
ASTRO-G Development schedule (Observing system) Concept Design Basic Design Detailed D. Manufacture and Test Operation WG phase Pre-Project PM FM D. FM M. I/F T Unit test Final T. FOp Operation △7B Phase -E Pre Phase -A Phase -A Phase -B Phase -C Phase -D Launch ICD FIX △Review △Review △Review Concept D. Basic D. MTM/TTM Detailed D. MTM/ TTM M. MTM/ TTM T. PFM R. I/F T. Final T. F Op In Orbit Operation △11B △10B △7B △2B △8M △2B △7B △12B 10B△ △2B ↑ ↓ Concept D. 1 Module Basic D. Main Str. Detailed D. Main Str. M. PFM R. Antenna T. I/F T. Final T. F Op In Orbit Operation ICD FIX 6M △ FM D. FIX △ I/F Test (11) S/C simulator EM D. EM M. EM T. Concept Design △3B △1B △7B △11B FM D. FM M. FM T △3B Freq Control Doppler Mes. AUX data extract (When? -TBD) △7B △5B △10B IF I/F QPSK DEM VSI I/F D M. T D M. T △9B △6B
ASTRO-G TS Development schedule (DRAFT) Concept Design Basic Design Detailed D. Manufacture and Test Operation WG phase Pre-Project PM FM D. FM M. I/F T Unit test Final T. FOp Operation △7B Phase -E Pre Phase -A Phase -A Phase -B Phase -C Phase -D Launch ICD FIX △Review △Review △Review FM △ I/F Test (11) S/C simulator EM D. EM M. EM T. △Ready for TS (9) Concept Design △3B △1B △7B △11B D M. T D M. T IF I/F QPSK DEM VSI I/F Freq Control Doppler Mes. AUX data extract (When? -TBD) △9B △6B request△11 △3 review △8 MoO deadline △9 MoO deadline Concept Study money GTS GRT Op. Test D M. T EC FP7 deadline Budget National Agency To ESA D M. T D M. T
VSOP-2 international collaborations • VSOP-2 collaboration Based on VSOP type collaboration • Tracking stations (1 JAXA, 1-2 NASA, 1 ESA) Compatibility test at 2010 • GRT(Ground Radio Telescope)’s and Correlater (GVWG) • E-ASIA Collaborations: GRT, Correlater, Receiver ? • EVN, SKA, VLBA, Australia, Asia… GRT test observation at 2011. Pre-launch survey • Navigation • On-borad instruments (Not in VSOP) • GPSR, Accelerometer, Transmitter • LNA • Simulator, AIPS(++?) update. • Forming International WG. • International Science Team (Survey etc..)