An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Automated Export Documentation System AEDS Based on JMO 2-2002 BOC -PEZA

    3. Benefits Much lowered cost of export documentation processing Reduced clearing time Extended hours of service

    4. AEDS = Infrastructure + Re-engineered Process

    5. AEDS = Infrastructure + Re-engineered Process

    6. AEDS = Infrastructure + Re-engineered Process

    7. AEDS = Infrastructure + Re-engineered Process

    8. AEDS = Infrastructure + Re-engineered Process

    9. AEDS = Infrastructure + Re-engineered Process

    10. AEDS = Infrastructure + Re-engineered Process

    11. AEDS = Infrastructure + Re-engineered Process

    12. Transaction Charge

    13. Cost Comparison

    14. Process Lead Time AEDS Encoding - 2 minutes Printing - 1 minute TOTAL = 3 minutes MANUAL Typing - 3 minutes Processing – 30 minutes TOTAL = 33 minutes

    15. Extended Hours of Service Processing 24 x 7 operation Weekends and holidays Customer Support 24 x 7 operation Weekends and holidays

    16. Hardware Requirements

    17. AEDS-enabled Ports and Qualified Industries

    18. Document Requirements

    19. Getting started … Prepare all hardware requirements including port opening if applicable. In coordination with your company IT, prepare the hardware requirements. From www.ekonek.com/downloads , download the following: Appropriate AEDS software accdg. to your operating system Appropriate VPN software accdg. to your operating system Call E-Konek once 1 & 2 are satisfied (see contact info). E-Konek shall send you The configuration file for the VPN (Virtual Private Network) with the simple instructions on how to load and test if your connectivity can reach the AEDS server. Two updated Asycuda files (nat & sys) with a simple instruction on how to load it. Once connection is established, we shall schedule you for training and live run on the day that you have a live shipment. Submit the SEIPI & E-Konek Information sheets to ekonek.help@ekonek.com and the Letter of Intent to PEZA before the live run date.

    20. E-Konek Customer Care

    21. Thank you. Visit our website at http://www.ekonek.com

More Related