An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EXPReS Annual Review- 2007 April 17 EXPReS Project Team JIVE, Coordinating Institution

  2. Agenda 09:00-09:30 Introductions / Overview 09:30-11:00 EXPReS Summary for Past 12 Months 20 NA1/NA2/NA3/NA4- Network Activities and Management 20 SA1- Production e-VLBI Service 20 SA2- Network Provision for a Global e-VLBI Array 20 JRA1- Future Arrays of Broadband Radio Telescop on Internet Computing 11:00-11:15 Break 11:15-11:45 External User: Benefits and capabilities of e-VLBI 11:45-12:30 Comments from E.C. on morning 12:30-13:15 Lunch 13:15-14:00 Financial Overview for Past 12 Months 14:00-15:15 Overview of project next 18 Months 15:15-16:00 Open Discussion 16:00-16:20 Reviewer Internal Meeting 16:20-16:30 First Feedback to the team 16:30 Conclusion / End of First Year Review EXPReS Annual Review

  3. SA2: Past 12 Month Review EXPReS- Looking Down Courtesy of Paul Boven and Google Maps EXPReS Annual Review

  4. SA2: Past 12 Month Review SA2- Network Provisioning • 19 institutions, operating 21 radiotelescopes • Coordination of work and funding at participant national level • First year is a learning experience, in particular for non-EU partners (China, Australia, etc) • EC partial funding (8.75:1 in proposal) acts as a great catalyst of work and national funding • Very uneven cost in Years 1-3 • First year at very lower cost (most deliverables are no-cost feasibility studies) • Some/more participants are able to obtain better deals for cheaper/free connectivity • 10 telescopes connected • 6 institutions • Other infrastructures delivered in 2007 EXPReS Annual Review

  5. 10 Gbps connected sites 1 Gbps connected sites SA2: Past 12 Month Review Site Connectivity EXPReS Annual Review

  6. EXPReS SA2 • Workpackages: • WP1: Feasibility study of last-mile connection of telescopes to JIVE via GÉANT2 • WP2: Provision of the infrastructure and equipment • WP3: Connectivity tests • Deliverables • Feasibility studies • Infrastructures ready for 9 sites • Six telescopes operating routinely at 256 Mbps • Milestones EXPReS Annual Review

  7. SA2: Past 12 Month Review Network structure EXPReS Annual Review

  8. EXPReS SA2 Achievements • EVN European institutions • Previous to EXPReS SA2: Connection ready for JIVE to: Westerbork, Onsala, Torun, Jodrell Bank, Medicina, Metsähovi • Feasibility studies: • Finished for all EU sites: MPIfR, CNIG-IGN, Metsähovi, VIRAC • MPIfR and CNIG-IGN will connect in 2007 • Connectivity tests • Medicina integrated in e-VLBI network in Aug 2006 • Routine operations achieved up to 256 Mbps EXPReS Annual Review

  9. EXPReS SA2 Achievements • EVN non-European institutions • Feasibility studies • Finished, but international part ongoing: ShAO, NAIC, HRAO • Connectivity tests • Planning tests for MRO, ShAO, NAIC • Non EVN institutions • Feasibility studies • Finished for non-EU sites, but international part ongoing: CSIRO, TIGO • Connectivity tests • Planning tests for CSIRO EXPReS Annual Review

  10. Connectivity status EXPReS Annual Review

  11. Summary • No major changes in deliverables. • Most partners have lower costs, as expected. • Total SA2 cost lowered from 7.8 M€ to 6.9 M€ (savings of 0.9 M€). EC contribution is 0.8 M€. • Feasibility studies (no cost item) finished for European partners; international part for non-EU partners still ongoing. • Major infrastructures to be available in 2007 (MPI, CNIG). • Good prospects for non-EU partners to reach Europe (CSIRO, HRAO, ShAO, TIGO, NAIC). EXPReS Annual Review

  12. Agenda 09:00-09:30 Introductions / Overview 09:30-11:00 EXPReS Summary for Past 12 Months 20 NA1/NA2/NA3/NA4- Network Activities and Management 20 SA1- Production e-VLBI Service 20 SA2- Network Provision for a Global e-VLBI Array 20 JRA1- Future Arrays of Broadband Radio Telescop on Internet Computing 11:00-11:15 Break 11:15-11:45 External User: Benefits and capabilities of e-VLBI 11:45-12:30 Comments from E.C. on morning 12:30-13:15 Lunch 13:15-14:00 Financial Overview for Past 12 Months 14:00-15:15 Overview of project next 18 Months 15:15-16:00 Open Discussion 16:00-16:20 Reviewer Internal Meeting 16:20-16:30 First Feedback to the team 16:30 Conclusion / End of First Year Review EXPReS Annual Review

  13. Conclusion Questions/Answers • Contact information T. Charles Yun Project Manager EXPReS (JIVE) tcyun at jive dot nl • Additional Information http://expres-eu.org/ [note: only one “s”] http://www.jive.nl/ • EXPReS is made possible through the support of the European Commission (DG-INFSO), Sixth Framework Programme, Contract #026642 EXPReS Annual Review

  14. Conclusion EXPReS EXPReS Annual Review