POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio. LOAD DIVERSITY. The unique load curve of different identities due to varied nature of load / requirements results in the overall load diversity. DEMAND ESTIMATION. Availability = Own Generation
E N D
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio
LOAD DIVERSITY The unique load curve of different identities due to varied nature of load / requirements results in the overall load diversity.
DEMAND ESTIMATION Availability = Own Generation (+) Entitlement from Grid (+) Bilaterals
ENTITLEMENTS = Fixed Shares + Unallocated Shares
FIXED SHARES Allocation to States from the Central Sector Stations in terms of Percentages which generally remain fixed. UNALLOCATED SHARES Allocation to States from Central Sector Stations in terms of Percentages which are changed on seasonal basis and / or under typical conditions as decided by Govt. of India.
3rd J A N U A R Y 2 0 0 4
Inter Regional HVDC Links HCDC Vindhyachal B-B HCDC Sasaram B-B HCDC Chandrapur B-B HCDC Gazuaka B-B HCDC Talcher Kolar