1 / 25

Present situation, investment climate and perspective development of Uzbekistan’s power system

STATE JOINT STOCK COMPANY « UZBEKENERGO ». Present situation, investment climate and perspective development of Uzbekistan’s power system. Mr. Shukhrat Khamidov Head of Department. uzenergy.uzpak.uz sjsc@uzpak.uz. Structure of Executive Body of the State Joint Stock Company “Uzbekenergo”.

pello
Download Presentation

Present situation, investment climate and perspective development of Uzbekistan’s power system

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. STATE JOINT STOCK COMPANY «UZBEKENERGO» Present situation, investmentclimate and perspective development of Uzbekistan’s power system Mr. Shukhrat Khamidov Head of Department uzenergy.uzpak.uz sjsc@uzpak.uz

  2. Structure of Executive Body of the State Joint Stock Company “Uzbekenergo” Council of the Company The Boardof Company Power generation companies: TPP, HPP, HPP cascades Power sale company (affiliate) Coal production OJSC "Uzbekugol" with affiliates Repair and adjustment companies Design institutes Power transportation UE "Uzelektroset" with functional and zone affiliates Construction-and-Mounting company Logistical support companies Branch general functions UE Uzenergosozlash company Power distribution and selling companies Others Slide 1

  3. Structure of installed capacities of the power plants of Uzbekistan Slide 2

  4. Main power generation plants ofSJSC "Uzbekenergo" Slide 3

  5. Structure of fuel consumption by power plants of the Company in 2004 Slide 4

  6. Structure of electrical network Slide 5

  7. Structure of power consumption by branches of economy and population in 2004 Slide 6

  8. Electric power tariffs for domestic consumption Slide7

  9. Measures for generation capacity commissioning for the period of years 2001-2010 Slide8

  10. 220-500 kVelectric network development for the period till 2010 Slide9

  11. Slide 10

  12. Financial results of the Company for 2004 Slide 11

  13. Joint Stock Companies (OJSC) which share are subject for sale * -There is a process of definition of starting cost of a sold package of the shares. ** - Market value of holding of shares is thous. US$

  14. Installation of modern electric power meters in networks Slide13

  15. Strategic aims of development of electric Power Industry till 2010 are the following: • reliable power supply of population and industry with qualitative electrical power; • technical re-equipment and modernization of branch facilities, efficiency and functional improvement; • reduction of negative energy production impact on the environment; • further development of economical reforms creation and development electrical power market; • integration process improvement in the unified power grid of the Central Asia. Slide14

  16. «Syrdarya TPP» modernization • The company conducts the reconstruction works on Syrdarya TPP, having 10 energy units with single design capacity 300 MW • The first phase of reconstruction of two power unit № 7 and № 8 by means of EBRD loan financing for the amount of USD 27,8mln was carried out at Syrdarya TPP • Second phase – next power units reconstruction. Project cost will be defined after FS preparation Slide15

  17. Modernization of the «Tashkent TPP» • The agreement between JBIC and Government of Republic of Uzbekistan was signed in 2002 where the Government of Japan provides the promotional loan at the amount of JY24 955 mln. for implementation of this project • The project provides construction of 370 MW Combined Cycle Power Plant at Tashkent TPP with commissioning in 2008 • The International Consulting Company on support of this project was selected by means of Bidding • Now the preparation to Bidding process for selection of EPC Contractor is carrying out Slide16

  18. Modernization of «Navoi TPP» • The installed capacity of Navoi TPP is 1250 MW. The Plant has 2 units of 210 MW, 4 units of 160MW, 6 boilers and 5 turbines, producing electric and thermal power • The project provides construction of 346 MW modern Combined Cycle Power Plant. The Project Feasibility Study has developed and passed the examination in the authorized bodies. The total project cost according to Feasibility Study is US$ 232 mln Slide17

  19. Mubarek CHPreconstruction • The installed capacity of Mubarek CHP – 60 MW, plant has 3 boilers with steam productive capacity till 500 tn/h and 2 turbines, producing electrical - and thermal energy • The Feasibility Study (FS) of the project was developed and passed the examination in the authorized bodies. The total project cost in compliance with Feasibility Study is USD103,2 mln • The investment project purpose is the reconstruction and expansion of operating capacities of Mubarek CHP with commissioning of 2 unit (gas turbine mounting) of total capacity 106,3 MW of electrical energy and 400 ton /h of steam Slide18

  20. Construction of 500 kV High Voltage transmission line from Syrdarya TPP to Sogdianasubstation • Project goal is effective power supply of Samarkand – Bukhara region, reduction electric power losses in transmission lines • Islamic Development Bank allocated 25 mln. US dollars for this project with total cost 44 mln. US dollars. Now we are in a bidding process for project consulting company Slide19

  21. 500 kV High Voltage transmission line construction from SS Sogdiana to Talimardjan TPP • Project realization is planned for the period 2006-2007. Project total cost 70 mln. USD, including IDB loan - 25 mln. USD • Project goal is reliable power supply of Samarkand – Bukhara region, reduction electric power losses in transmission lines Slide20

  22. Coal deposits of Republic of Uzbekistan Slide 21

  23. The forecast of structure of fuel consumption for electric power production at Power Plants of Uzbekistan (%) Slide 22

  24. Work of rotor complex at open-pit mine "Angrenskiy" Slide 23

  25. Slide 24