140 likes | 265 Views
CONTENT. Company production strategy. Production system. Good manufacturing practice. Machinery manufacturing. Oprema Intercom production. Production capacity. COMPANY PRODUCTION STRATEGY. PRODUCTION SYSTEM. GMP (Good Manufacturing Practice). EQUIPMENT FOR METAL SHEET PROCESING.
E N D
CONTENT • Company production strategy • Production system • Good manufacturing practice • Machinery manufacturing • Oprema Intercom production • Production capacity
THERMODYNAMIC LABORATORY Thermodynamic laboratory consists of 3 chambers. Two of them are equipped so that ambient temperature can be held at any temperature between 0-40ºC with tolerance +/-0,5ºC. One of them is equipped so that humidity could be held between 30 – 100%. Laboratory is equipped with water line, controlled temperature (0-40ºC) which is used for thermal load simulation or as inlet water for draw simulation. Data acquisition system is controlled by OMRON PLC C200 Series with analog and digital inputs and digital outputs. All parameters: temperatures, pressures, current, power, power consumption are analyzed by PLC and by SCAD Omron CX-Supervisor tool stored in computer. Furthermore, system has a possibility of managing with tested equipment on the base of input data and previous recorded software.
PRODUCTION CAPACITY • 50.000 units ( instaled capacity) • Production capacity per product : UNITS Beer coolers and dispensers 30.000 -35.000Postmix dispensers 2.000-5.000 Wine coolers and dispensers2.000-3.000 Water coolers and dispensers 5.000- 8.000 Demo bars 1.000 – 2.000 Cooling cabinets 1.500- 2.500 Towers 8.000-10.000 Tubes2 500 000 m