370 likes | 483 Views
EMR 6500: Survey Research. Dr. Chris L. S. Coryn Spring 2012. Agenda. Implementation procedures When more than one survey mode is needed In-class activity. Implementation Procedures. Mail Survey Implementation. Mail Survey Implementation.
E N D
EMR 6500:Survey Research Dr. Chris L. S. Coryn Spring 2012
Agenda Implementation procedures When more than one survey mode is needed In-class activity
Mail Survey Implementation • When high quality implementation procedures are used, response rates of 50%-70% are not uncommon • In my own work, I have had response rates as high as 90% • Implementation must receive considerable thought and planning • It should not occur after questionnaire design, but simultaneously
Mail Survey Implementation • General guidelines • To the extent possible, personalize all contacts to respondents (even when names are unavailable) • Send a token of appreciation with the survey request • Use multiple contacts, each with a different look and appeal • Carefully and strategically time all contacts • Select all mail-out dates with the characteristics of the population in mind
Mail Survey Implementation • General guidelines • Place information in the mailing exactly where it needs to be used • Take steps to ensure that mailings will not be mistaken for junk mail or marketing materials • Evaluate the size and weight of mailing materials on mailing costs • Assemble the mailings in a way that maximizes the appealing aspects of each element when the package is opened
Mail Survey Implementation • General guidelines • Ensure that all addresses in the sample comply with current postal regulations • Assign an individual ID number to each sample member • Establish procedures for dealing with undeliverable mail • Establish procedures for dealing with returned incentives • Establish procedures for dealing with respondent inquiries • Evaluate early returns for problems that can be addressed mid-stride
Prenotice Letter • Sent to respondents a few days prior to the questionnaire • It notes that a questionnaire is for an important survey that will arrive in a few days and that the person’s response will be greatly appreciated • This letter can increase response rates by 3%-6% • No recent research comparing postcards to letters (I prefer the former)
Questionnaire Mailing Includes a detailed cover letter explaining why a response is important The questionnaire A prepaid postage envelope A token incentive if one is to be provided
Thank You Postcard Sent a few days to a week after the questionnaire The mailing expresses appreciation for responding and indicates that if the completed questionnaire has not yet been mailed it is hoped that it will be returned soon
Replacement Questionnaire Sent to respondents 2 to 4 weeks after the previous questionnaire mailing It indicates that the person’s completed questionnaire has not yet been received and urges the recipient to respond
Final Contact Sent using a different mode of delivery 2 to 4 weeks after the previous mailing The different mode of contact distinguishes each type of final contact from regular mail delivery Special contacts have been shown to increase response
Web Survey Implementation • Major concerns associated with web surveys • Mode of initial contact • Extent to which personalized elements can be used • Whether and how incentives are delivered • Timing of contacts
Web Survey Implementation • General guidelines • To the extent possible, personalize all contacts to respondents • Send a token of appreciation with the survey request • Use multiple contacts and vary the message across them • Carefully and strategically time all contacts with the population in mind • Consider contacting respondents by another mode when possible
Web Survey Implementation • General guidelines • Keep e-mail contacts short and to the point • Take steps to ensure that e-mails are not flagged as spam • Carefully select the sender name and address the subject line text for e-mail communications • Provide clear instructions for how to access the survey • Make obvious connections between the opening screen and other implementation features
Web Survey Implementation • General guidelines • Assign each sample member a unique ID number • Know and respect the capabilities and limits of the web server(s) • Establish a procedure for dealing with bounced e-mails • Establish procedures for dealing with returned incentives • Establish procedures for dealing with respondent inquiries • Implement a system for monitoring progress and evaluating early completes
Why Consider a Mixed-Mode Survey Design Lower costs Improve timeliness Reduce coverage error Deliver incentives
Type I Use one mode to contact respondents and to encourage response by a different mode
Type II Use a second mode to collect responses from the same respondents for specific questions within a questionnaire
Type III Use alternative modes for different respondents in the same survey period
Type IV Use a different mode to survey the same respondents in a later data collection period
Why Different Survey Modes Sometimes Produce Different Answers to Survey Questions
Presence versus Absence of an Interviewer Locus of control Normative question order effects Social desirability Acquiescence
Aural versus Visual Communication Effects Primacy/recencyeffects
Activity • The Swiss National Science Foundation (SNSF) receives approximately 3,000 applications for research funding annually. Of these, approximately half are funded. The SNSF wants to determine what proportion of applicants perceive the review process as biased. • In small groups of 2-3, solve the following problems: • What sampling method is most appropriate and why? What are your assumptions? • Based on your selected sampling method for #1, what sample size is necessary to determine the proportion of applicants who believe that the review process for research funding is biased with a bound on the error of estimation of 0.05?