190 likes | 281 Views
Tier-2 Status Report. T2_IN_TIFR of all-of-us , for all-of-us , by some-of-us. March 27,28 2009. IndiaCMS Meeting, Delhi. 1. 80K equivalent of SI2K Dual Xeon@3.6 GHz, 1U servers 1 GB/core memory Additionally, 45 Blade Servers Quad Core Clovertown ( E5355@2.66 GHz)
E N D
Tier-2 Status Report T2_IN_TIFRof all-of-us, for all-of-us, by some-of-us March 27,28 2009 IndiaCMS Meeting, Delhi 1
80K equivalent of SI2K Dual Xeon@3.6 GHz, 1U servers 1 GB/core memory Additionally, 45 Blade Servers Quad Core Clovertown (E5355@2.66 GHz) 2 GB/core memory: 72 GB HDD (15K rpm) 16 Blades/enclosure Occasionally some of the servers are failing, under investigation. Hardware Resources (Computing) March 27,28 2009 IndiaCMS Meeting, Delhi 2
T1_ASGC in Taiwan had an unfortunate fire accident, has been down for more than 1 month. Official MC simulation jobs , ie, Production at our T2, is supposed to be initiated by ASGC.
DPM (Disk Pool Manager) with SRM (storage server module) support . 34 TB of RAID-6 with 2 GB FC (HP EVA 8K). + 350 TB of RAID-6 pledged, available currently about 100 TB In storage boxes: 4U, 24 Hot Swap bays, quad core 2 processors 2 GB/core memory Enterprize class 1 TB SATA 2 HDDs SLC(X86_64, 64-bit), xfs Multiple NICs. For India-CMS user, storage set aside ~ 20TB 0.5 TB/user. If you want to make use of this T2, and don’t have assigned directory, contact us. Minimal ‘how to’ has been circulated already (must have valid grid certificate). Hardware Resources (Storage) IndiaCMS Meeting, Delhi 5 March 27,28 2009
1 Gbps LAN for the farm. Dedicated 300Mbps/1Gbps link to CERN (1:1). 45 Mbps internet link (GEANT) to CDAC, about to be upgraded to 100 Mbps. CDAC to Milano: 100 Mbps GEANT link. Recently CERN link has been peered with GEANT link connectivity of our T2 with various T1s and outside world has improved dramatically! Hardware Firewall Units (Gbps). Network • Crucial Milestone achieved = Load Test Success (we had succeeded already only with CERN) March 27,28 2009 IndiaCMS Meeting, Delhi 7
Tier 2/3 Centers in India Tier 0/1 Centre CERN/ GEANT Tier 2 and Alice users Tier 2 Centre and CMS users Internet 300/1000 Mbps VECC TIFR 100 Mbps 4 Mbps 2/10 Mbps 34/100 Mbps 2/10 Mbps POP in Mumbai Uses WLCG tools 34/100 Mbps ALICE: Universities & Institutes Tier 3 Tier 3 and CMS Users BARC CMS: Universities & Institutes Tier 3 DAE/DST/ERNET: Geant link operational since August 2006
Sufficient Power. Air conditioning. UPS to support upto 50KW for 3 hours. Site load will be approx 35KW. Control cabin. Sound proofing under consideration. To be done: instructions to use. Infrastructure March 27,28 2009 IndiaCMS Meeting, Delhi 12
User Interface for Tier3 almost done. Testing of jobs going on. Pledge for computing and storage resources for 2010 under consideration. Plans March 27,28 2009 IndiaCMS Meeting, Delhi 13
Site is up and running! Please visit CMS-dashboard which gives Sam test results in terms of site availability: overall health of the site, CE, SRMv2. CMS Grid Map: http://gridmap-cms.cern.ch/cms/ (click on T2_IN_TIFR block) 2. Site Report: http://twiki.cern.ch/twiki/bin/view/CMS/FacilitiesOps-SiteReportBlackboard Provides Job status, Success rate, Service availability. Get familiar with PhEDex regarding availibility of data, transfers etc.: http://cmsweb.cern.ch/phedex Site details in: https://cmsweb.cern.ch/sitedb/sitelist/ (needs login) Site Status March 27,28 2009 IndiaCMS Meeting, Delhi 14
March 27,28 2009 IndiaCMS Meeting, Delhi 16
March 27,28 2009 IndiaCMS Meeting, Delhi 17
March 27,28 2009 IndiaCMS Meeting, Delhi 18
March 27,28 2009 IndiaCMS Meeting, Delhi 19
/Wtaunu/Summer08_IDEAL_V9_v1/GEN-SIM-RECO /QCD_BCtoMu_Pt30to50/Summer08_IDEAL_V9_v1/GEN-SIM-RECO /TauolaTTbar/Summer08_IDEAL_V9_v1/GEN-SIM-RECO /QCD_BCtoMu_Pt120to170/Summer08_IDEAL_V9_v1/GEN-SIM-RECO /InclusivePPmuX/Summer08_IDEAL_V9_v4/GEN-SIM-RECO /InclusiveMu5Pt150/Summer08_IDEAL_V9_v1/GEN-SIM-RECO /InclusiveMu5Pt350/Summer08_IDEAL_V9_v1/GEN-SIM-RECO /Ztautau/Summer08_IDEAL_V9_v1/GEN-SIM-RECO /InclusiveMu5Pt250/Summer08_IDEAL_V9_v1/GEN-SIM-RECO /InclusiveMuPt15/Summer08_IDEAL_V11_redigi_v1/AODSIM /InclusiveMu5Pt50/Summer08_IDEAL_V9_v1/GEN-SIM-RECO /Zmumu/Summer08_IDEAL_V2_IDEAL_V2_v1/RECO /DYmumuM200/Summer08_IDEAL_V9_v1/GEN-SIM-RECO /Wmunu/Summer08_IDEAL_V9_v1/GEN-SIM-RECO • Hosting data • We have requested many • transfers via Phedex. • Mostly Summer08 fullsim, • Will also try to host also winter09 fastsim samples. • Some of the sample names are given. • If you need anything else, make a request in Phedex and send a mail with • justification.