An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Main Injector For Collider Run II February 8, 2001 Denton Morris dmorris@fnal.gov

  2. The Many Hats of the Main Injector • Stacking: 120 GeV protons to the Antiproton Source target • Shots: 150 GeV protons to the Tevatron • Shots: 150 GeV antiprotons to the Tevatron • Shot setup: 8 GeV protons (reverse) to the Accumulator • Shot setup: 150 GeV protons to the Tevatron • Recycler commisioning • NUMI • MiniBoone • 120 GeV Fixed Target

  3. Keeping Track of what’s going on • Notify – new and improved… • 2D 8 GeV protons • 29 120 GeV for Pbar production • 2A 150 GeV antiproton transfers • 2B 150 GeV proton transfers 9 9 9 9 9 9 9 9 D A D B D A D

  4. 8 GeV Protons from Booster • All 8 GeV protons originate from the Proton Source • PreAcc • Linac • Booster • MI-8 line

  5. Acceleration to 120 GeV for Antiproton Production • 84 bunches (one Booster batch) of 8 GeV protons from the Proton Source are accelerated to 120 GeV and extracted from the Main Injector down the P1, P2 and AP1 lines to the Pbar target at AP0 • P1, P2 and AP1 line running in 120 GeV mode

  6. 150 GeV Protons for Tevatron • Nine batches of 11 bunches from Booster • Accelerated to 150 GeV • Coalesce 9 batches of 11 into 9 single bunches • Bucket to bucket transfer to TeV • P1 line running in 150 GeV mode

  7. Coalescing • Building a bigger bunch

  8. Coalescing • 53 MHz bunch structure h=588 • Overlay 2.5 MHz RF h= 28 and 5 MHz h=56 • Remove 53 MHz • Allow bunches to rotate • Recapture with 53MHz

  9. 150 GeV Proton Coalescing

  10. 8 GeV protons for beamline and Acculumator Shot Setup • Low intensity to approximate antiprotons • P1, P2, AP1 and AP3 lines running 8 GeV mode

  11. 150 GeV Antiprotons for Tevatron

  12. 150 GeV Antiprotons for Tevatron • 8 GeV in, 150 GeV out • Coalesce 4 batches of 11 bunches into 4 bigger bunches • Beamline gymnastics • P1, P2, AP1 and AP3 beamlines running 8 GeV • A1 line running 150 GeV • P1/A1 load switching

  13. Antiproton Coalescing • The four batches of 9 bunches are coalesced into 4 big bunches • Similar to proton coalescing

  14. 150 GeV Antiprotons for Tevatron

  15. Beamline Gymnastics • Antiproton transfers to Main Injector • P1, P2, AP1, AP3 running 8 GeV for Accumulator to MI • Antiprotons from Main Injector to TeV • A1 line running 150 GeV • Problem: P1 and A1 lines use the same power supplies with load switches.

  16. Beamline Gymnastics • Power supplies start at 8 GeV level with load switches to P1 • After injection power supplies ramp down • Load switches switch to A1 line • Power supplies ramp to 150 GeV for transfer • Power supplies ramp back down and switch back to P1 loads

  17. Where Are We Now? • Protons for collisions • Coalescing 7 bunches (200e9 ppb) • 1 bunch at a time (we have done two) • ~80% efficient • Longitudinal emittance ~3.2 eV-sec • Need to understand the emittance growth that occures before coalescing • Transverse emittance blows up during transfers

  18. Where Are We Now? • Antiprotons for Collisions • 30e9 pbpb (60mA stack) • >90% efficiency • Transverse emittance growth during Accumulator to Main Injector transfer

  19. Where Are We Now? • 120 GeV protons for antiproton production • 4.5e12 protons on target (5e12 by June ’01) • Production cycle time 1.46 seconds

  20. Final Results? • 400 pb-1 by Spring 2002