Linear Programming Topics • General optimization model • LP model and assumptions • Manufacturing example • Characteristics of solutions • Sensitivity analysis • Excel add-ins
Deterministic OR Models Most of the deterministic OR models can be formulated as mathematical programs. "Program" in this context, has to do with a “plan” and not a computer program. Mathematical Program Maximize / Minimize z = f(x1,x2,…,xn) { } £ gi(x1,x2,…,xn) Subject to bi , i =1,…,m ³ = xj ≥ 0, j = 1,…,n
Model Components • xj are called decision variables. These are things that you control { } £ • gi(x1,x2,…,xn) bi are called structural ³ = (or functional or technological) constraints •xj ≥ 0 are nonnegativity constraints • f (x1,x2,…,xn) is the objective function
Feasibility and Optimality ( ) x 1 . . • A feasible solution x = satisfies all the . x n constraints (both structural and nonnegativity) • The objective function ranks the feasible solutions; call them x1, x2, . . . , xk. The optimal solution is the best among these. For a minimization objective, we have z* = min{f(x1), f(x2), . . . , f(xk)}.
Linear Programming A linear program is a special case of a mathematical program where f(x) and g1(x),…, gm(x)are linear functions Linear Program: Maximize/Minimize z = c1x1 + c2x2 + • • • + cnxn { } £ Subject to ai1x1 + ai2x2 + • • • + ainxn i = 1,…,m ³ bi , = xjuj, j = 1,…,n xj³ 0, j = 1,…,n
LP Model Components xjuj are called simple bound constraints x = decision vector = "activity levels" aij , cj ,bi , uj are all known data goal is to find x = (x1,x2,…,xn)T (the symbol “T” means)
Linear Programming Assumptions ( i) proportionality (ii) additivity linearity (iii) divisibility (iv) certainty
Explanation of LP Assumptions (i) activity j’s contribution to objective function is cjxj and usage in constraint i is aijxj both are proportional to the level of activity j (volume discounts, set-up charges, and nonlinear efficiencies are potential sources of violation) 1 no “cross terms” such as x1x5 may not appear in the objective or constraints. (ii) 2
Explanation of LP Assumptions (cont’d) (iii) Fractional values for decision variables are permitted (iv) Data elements aij , cj , bi , uj are known with certainty • Nonlinear or integer programming models should be used when some subset of assumptions (i), (ii) and (iii) are not satisfied. • Stochastic models should be used when a problem has significant uncertainties in the data that must be explicitly taken into account [a relaxation of assumption (iv)].
Data for Manufacturing Example Machine data Product data
Data Summary P Q R Selling price/unit 90 100 70 45 40 20 Raw Material cost/unit 100 40 60 Maximum sales 20 10 10 Minutes/unit on A 12 28 16 B 15 6 16 C 10 15 0 D Machine Availability: 2400 min/wk Structural coefficients Operating Expenses = $6,000/wk (fixed cost) Decision Variables xP = # of units of product P to produce per week xQ = # of units of product Q to produce per week xR = # of units of product R to produce per week
Are the LP assumptions valid for this problem? * * * x = 81.82, = 16.36, x = 60 Optimal solution x R Q P LP Formulation Objective Function xQ+ 50 xR – 6000 + 60 max z = 45 xP £ 10 xQ + 10 xR 20 xP + 2400 Structural s.t. £ constraints 12 xP + 28 xQ + 16 xR 2400 £ 15 xP + 6 xQ + 16 xR 2400 £ 10 xP + 15 xQ + 0 xR 2400 demand xP 100, xQ 40, xR 60 xP 0, xQ 0, xR 0 nonnegativity Are we done?
Discussion of Results for Manufacturing Example • Optimal objective value is $7,664 but when we subtract the weekly operating expenses of $6,000 we obtain a weekly profit of $1,664. • Machines A & B are being used at maximum level and are bottlenecks. • There is slack production capacity in Machines C & D. How would we solve model using Excel Add-ins ?
Characteristics of Solutions to LPs A Graphical Solution Procedure (LPs with 2 decision variables can be solved/viewed this way.) 1. Plot each constraint as an equation and then decide which side of the line is feasible (if it’s an inequality). 2. Find the feasible region. 3. Plot two iso-profit (or iso-cost) lines. 4. Imagine sliding the iso-profit line in the improving direction. The “last point touched” as the iso-profit line leaves the feasible region region is optimal.
Two-Dimensional Machine Scheduling Problem -- let xR = 60 Objective Function xQ + 3000 max z = 45 xP + 60 £ 10 xQ 20 xP + 1800 Structural s.t. £ constraints 12 xP + 28 xQ 1440 £ 15 xP + 6 xQ 2040 £ 10 xP + 15 xQ 2400 demand xP 100, xQ 40 xP 0, xQ 0 nonnegativity
Possible Outcomes of an LP 1. Unique Optimal Solution 2. Multiple optimal solutions : Max 3x1 + 3x2 s.t. x1+ x2 £1 x1, x2 ³ 0 feasible region is empty; e.g., if the 3. Infeasible : constraints include x1+ x2 £6 and x1+ x2 7 4. Unbounded : Max 15x1+ 7x2 (no finite optimal solution) s.t. x1 + x2 ³1 x1, x2 ³ 0 Note: multiple optimal solutions occur in many practical (real-world) LPs.
Inconsistent constraint system Constraint system allowing only nonpositive values for x1 and x2
Sensitivity Analysis Shadow Price (dual variable) on Constraint i Amount object function changes with unitincrease in RHS, all other coefficients held constant Objective Function Coefficient Ranging Allowable increase & decrease for which current optimal solution is valid RHS Ranging Allowable increase & decrease for which shadow prices remain valid
What You Should Know About Linear Programming • What the components of a problem are. • How to formulate a problem. • What the assumptions are underlying an LP. • How to find a solution to a 2-dimensional problem graphically. • Possible solutions. • How to solve an LP with the Excel add-in.